CAR-T Processes
Materials & Equipment
Gowning
CNC Corridor
Aseptic Cleaning Techniques
100

This is the input for Day 3 Process

What are Activated T-Cells?

100

This is the first item to check when obtaining your process kit

What is the kitting form?

100

This is the gowning required to enter the Cell Culture Room

What is a White Lab Coat and a new pair of gloves?

100

This is the first gowning you put on to enter the CNC corridor

What is a bouffant?

100

This is how many days it takes a Bleach Bottle to expire

What is 30 days?

200

This is the amount of days it takes to fully complete a patient batch from beginning to end

What is 11 days?

200

This is the procedure for wiping in a 'dirty' clean room cart from the Mal-In

What is Bleach (10 min contact time), SporKlenz (10 min contact time), and IPA?

200

This is what happens when your glove rips inside the BSC and LFG

What is plating yourself and replacing your glove?

200

This is how many passthroughs are in the CNC Corridor

What is 10 passthroughs?

200

This is what C.A.R.T. stands for

What is Chimeric Antigen Receptor T-Cell Therapy?

300

This is the number of wipes per side used to clean a BSC 

What is 1 wipe per side?

300

These are the 2 disinfectants used to wipe in equipment into the C-Space

What is bleach and sporklenz?

300
This is the proper way for wearing your bouffant in the C Space

What is covering your nose?

300

This is used to transport samples from the CNC corridor to QC Lab

What is a biohazard tote?

300

This is the first thing you must do prior to begin your morning process in the designated process room

What is checking the daily cleaning crew log book? 

400

This is what impacts dose

What is patient weight, viable cell concentration, & LICAR?

400

This is the equipment used to separate supernatant from the cells in D10 Form Fill

What is the centrifuge?

400

This is the time-frame until your Grade B gowning expires inside the B Space

What is 6 hours?

400

This is what you must do if passthrough door lights were red when opened

 What is contact management?

400

This is the technique for cleaning a kit for any process day

What is..

1. Bleach entire tote (10 min contact time)

2. Once inside C Space, open tote to be bleached inside and out

3. Once tote has met 10 minute contact time, IPA entire tote and rip the outer most layer of the kit and IPA 

4. Place IPA'd kit inside tote and fill out your kitting form

?

500

This is what isolates the T-Cells during the D0 Prodigy Process

What is the magnetic beads?

500

This is the amount of time that your TSA Plates can remain open

What is 3 hours and 45 min?

500

This is what happens when Grade B Gowning is ripped inside B Space

What is exit plating and gowning out to regown back in?

500

This is why the Phase 3 CNC Corridor requires gowning as opposed to the Phase 2  

What is due to handling patient samples via process room passthroughs?

500

This is the new technique for cleaning your Grade B Gowning

What is... 

1. Place your dirty gowning on the bench 

2. Wipe the rack with IPA

3. Placing your dirty gowning on the clean rack

4. Wipe your IPA pack with IPA and place onto the clean rack

5. Wipe the bench with IPA

M
e
n
u