ORM Basics
Risk Assessment Severity Categories
Risk Assessment Probability Categories
ORM Terms
ORM Forms/Terms
100
What is the Operational Risk Management instruction number?
What is OPNAVINST 3500.39C.
100
What is Risk Assessment Severity Category II?
Significantly Degraded Mission Capability. Severe Injury, Extensive Damage to Equipment.
100
What is Risk Assessment Probability Category A?
Likely to occur within a short period of time.
100
What is probability?
What is a measure of the likelihood that a potential consequence will occur.
100
What is OPNAV form 3502/1?
What is Evolution ORM Assessment Sheet.
200
What is Operational Risk Management?
What is the process of dealing with risk associated with military operations.
200
What is Risk Assessment Severity Category I?
Loss of the Ability to Accomplish the Mission. Death, Loss of Mission Critical Equipment.
200
What is Risk Assessment Probability Category C?
May Occur in Time.
200
What is an Acceptable Risk?
What is the portion of an identified risk that is allowed to persist during the mission or task.
200
What is the form number of the Tailorable Evolution ORM Assessment Sheet?
What is OPNAV form 3502/2.
300
T/F: The purpose of ORM is to reduce or offset risks by systematically identifying hazards and assessing and controlling the associated risks allowing decisions to be made that weigh risks against mission or task benefits.
True.
300
T/F: Risk Assessment Severity Category IV is: Degraded Mission Capability. Minor Injury, Minor Damage to Equipment
False, that is RASC III.
300
T/F: Risk Assessment Probability Category C means probably will occur in time.
False. That is RAPC B.
300
What are controls?
What are actions taken or measures set to reduce hazards.
300
What is OPNAV form 3502/3?
What is the ORM Program Assessment Sheet.
400
What are the 4 principles of ORM?
1. Accept Risk when Benefits Outweigh the Cost. 2. Accept no unnecessary risk. 3. Anticipate and Manage Risk by Planning. 4. Make Risk decisions at the Right Level.
400
What is Risk Assessment Severity Category IV?
Little or No Adverse Impact on Mission Capability. Minimal Threat to Personnel and/or Equipment.
400
A matrix used to determine the level of risk after determining the risks' severity and probability is referred to as what?
What is the Risk Assessment Code.
400
What is a consequential error?
What is an error leading to undesired consequences to personnel or property.
400
What is Residual Risk?
What is the risk remaining after controls have been identified.
500
When should ORM be applied?
ORM should be applied to off duty activities also and practiced 24/7/365.
500
Which Risk Assessment Severity Category is the most egregious?
What is Risk Assessment Severity Category I.
500
What is Risk Assessment Probability Category D?
Unlikely to occur but not impossible.
500
What is a hazard?
What is a real or potential condition that can cause injury, illness, death, loss of property, and damage mission readiness.
500
What is a PHA?
What is a Preliminary Hazard Analysis, or the creation of an initial list of hazards that may exist in an operation.