Evacuation
Opening Closing Branch
Quality Control Check (QCC)
Quality Assurance
100

 The recommended minimum distance between the assembly area and the branch

What is at least 100 yards?

100

One of the two team members entering the branch must have this specific authorization

What is authorization for the alarm system?

100

the primary reason for implementing segregation of duties in an organization

What is to prevent fraud and errors.

100

MSRs should ensure all completed forms are stored according to this guideline.

What is branch document retention policy?

200

Included in the green folder besides the Emergency Action Plan?

 What is branch floor plan and Google Earth photo

200

Any time law enforcement is called to the branch, it must be reported to this team

What is Security Force Pensacola?

200

This type of fraud occurs when employees bypass controls for personal gain.

What is internal fraud?

200

MSRs should verify this before processing any member transaction.

What is member identification and account details?

300

Where the green folder should be stored if the branch does not have a Greeter Desk

 What is at the workstation closest to the entrance.

300

These areas must be inspected to ensure no one remains in the branch

What are work areas, break rooms, storage spaces, and restrooms?

300

 Loan documents must be retained for this period.

What is 7 years?

300

MSRs should never delay this after receiving instructions from Risk Office or leadership.

What is remediation action?

400

Branches that are exempt from creating their own evacuation plan and the reason why

 On-base branches, because they follow the command’s established guidelines.

400

Any exceptions to opening and closing procedures must be approved by sending an email to this office.

What is the BOD Risk Office?

400

This compliance process helps detect suspicious activity patterns.

What is AML monitoring (Anti-Money Laundering)?

400

MSRs should ensure that all member interactions balance these two priorities.

What are member service and operational soundness?

500

The four mandatory items that must be placed in the green folder

Branch floor plan with exits marked, Google Earth photo of assembly area(s), Emergency Action Plan template, Branch Closed signs.

500

This specific sequence of actions must be taken by the first team member if they suspect a break-in after entering the branch, including who to contact and what to do with the door.

What is immediately leave the branch, lock the exterior door, call local police or on-base security, contact Security Force Pensacola, and inform the AVP - Branch Operations team?

500

This daily process ensures accuracy and detects discrepancies early.

 What is daily reconciliation?

500

The physical security element that ensures sensitive documents are protected

What is secure storage and retention practices?

M
e
n
u