Bert
"The Basher"
Peanut
"The Punisher"
Vinnie
"The Virus"
Mugsy
"The Mauler"
Ernie
"The Enforcer"
100

Name the two types of ventilation:

a. Natural and re-circulation

b. Mechanical and convectional

c. Mechanical and natural

d. Conventional and re-circulation

c. Mechanical and natural

100

In order to eliminate the hazard, according to the “Reclassification” sections of the General Industry and Construction PRCS standards, which one of the following actions would meet the OSHA requirements?

a. Turn off a switch to a mixer/auger motor

b. On a gas line to a furnace, rotate the ball valve 90 degrees to the “Off” position

c. On a water tank, completely drain the tank and blank the incoming lines

d. In a hazardous atmosphere, activate a 5000 CFM blower to bring fresh air to the PRCS

c. On a water tank, completely drain the tank and blank the incoming lines

100

Which if any standard notates that a confined space may not use forced air ventilation for reclassification?

a. Construction Standard

b. Both Standards

c. General Industry Standard

d. Neither Standard

b. Both Standards

100

When using colorimetric detector tube sampling which of the following is important to understand when interpreting the results?

a. It is for a snapshot in time

b. It takes a long time to get the results

c. There is limited specificity in the results

d. The instrument reading are difficult to interpret

a. It is for a snapshot in time

100

An air-monitoring instrument is actively exposed to a known concentration of test gas, and the response of the sensors is simply noted. No instrument adjustments are made. This action is referred to as a:

a. Bump test

b. Calibration

c. Span test

d. Leak test

a. Bump test

200

In the General Industry Confined Spaces standard, when a condition arises that is not allowed under the permit, the permit is to be terminated. In the Confined Spaces in Construction standard, the permit may be:

a. Suspended or cancelled

b. Cancelled and terminated

c. Terminated only

d. Suspended only

a. Suspended or cancelled

200

If the employer chooses to reclassify a permit space under either the General Industry or the Construction confined spaces standards, which one of the following requirements applies?

a. The hazard making it a PRCS must be non-atmospheric and must be eliminated prior to entry

b. The hazard must be atmospheric and must be controlled by forced air ventilation

c. A certificate must be filled out prior to entry stating the hazards have either been controlled or

eliminated

d. The entry must follow procedures documented on a completed permit

a. The hazard making it a PRCS must be non-atmospheric and must be eliminated prior to entry

200

Which one of the following statements is a requirement of both General Industry and Construction PRCS standards?

a. Employers must document that they have conducted the initial evaluation of their workplace to determine if any spaces are PRCS

b. If employers decide that their employees will enter permit spaces, they shall develop and implement a written permit space program

c. Employers need not comply with any part of the standards if they have identified the permit spaces and have taken effective measures to prevent their employees from entering those spaces

d. The employer must post danger signs to identify permit spaces

.

b. If employers decide that their employees will enter permit spaces, they shall develop and implement a written permit space program

200

A Competent Person must be able to:

a. Act as the Controlling Contractor at the worksite

b. Oversee all confined spaces permit activities

c. Identify hazards and have authority to correct the hazards

d. Demonstrate subject matter expertise and problem solving ability on PRCS issues

c. Identify hazards and have authority to correct the hazards

200

Which of the following statements is incorrect?

a. Once all the hazards associated with a permit space are eliminated, it may be reclassified as a non-permit space

b. Once a hazard is reintroduced into a space that has been reclassified from a permit space to a non-permit space, the reclassified space again becomes a permit space

c. Providing ventilation to keep air contaminants below the PEL is considered to be elimination of the hazard

d. A hazard is eliminated if no ongoing measures are required to keep the space hazard-free

c. Providing ventilation to keep air contaminants below the PEL is considered to be elimination of the hazard

300

Choose the duty that is identical for entrant, attendant, and entry supervisor:

a. Verify that the means of summoning rescue personnel are operable

b. Monitor activities inside and outside of the space to maintain safe entry conditions

c. Know the hazards that may be faced during PRCS entry

d. Properly use all equipment provided for entry operations, including Personal Protective Equipment

c. Know the hazards that may be faced during PRCS entry

300

Both General Industry and Construction PRCS standards require initial training of all employees

whose work is regulated by the standards. According to OSHA, additional training also is required:

a. On an annual basis thereafter

b. When the employer believes that the employee’s PRCS knowledge is inadequate

c. After a change in assigned duties within the employer’s PRCS program

d. After a near miss or fatality occurs during a confined space entry

b. When the employer believes that the employee’s PRCS knowledge is inadequate

300

An employer attempts to eliminate an engulfment hazard (3-foot deep sediment water) in a 20-foot deep open top tank that is currently classified as a PRCS. (The tank is only filled manually with a hose, no piped supply lines). Engulfment is the only hazard in the space. The tank is drained by opening a drainage valve from outside the tank. In order to verify that the engulfment hazard has been eliminated, and that no new hazards (e.g. slips) are present, a worker must enter to visually inspect the tank. Such an entry:

a. May be performed as a reclassification entry, all hazards are eliminated

b. Must be performed as a full permit entry, hazard abatement not yet verified

c. May be performed as an alternate procedures entry, with signed certification

d. Requires no permit, no certification, and no special procedures, since there are no hazards at the time of entry

b. Must be performed as a full permit entry, hazard abatement not yet verified

300

If the only hazard in a confined space is airborne asbestos fibers what should the space be classified as?

a. Non-permit confined space

b. Permit-required

c. Non-permit under alternate procedures

d. Non-permit under reclassification

a. Non-permit confined space

300

The General Industry and Confined Spaces in Construction standards require certain equipment to be provided to the employees. Of the equipment listed below, which choice is uniquely specific to Subpart AA Construction standard?

a. Lighting equipment

b. Communication equipment

c. Barriers and shields

d. Engulfment monitoring system

d. Engulfment monitoring system

400

The Confined Spaces in Construction Standard goes beyond General Industry for rescue and emergency services in that, the employer will be notified by the designated service:

a. As soon as their services become unavailable

b. As soon as the rescue service summoning means becomes operable

c. When the designated rescue can be performed in a timely manor

d. When situations outside the space arise that could compromise the rescue

As soon as their services become unavailable

400

In the Confined Spaces in Construction Standard, training is to be provided:

a. If a deviation of the permit space entry procedures occur

b. In the language of the communication attendant

c. In a language and vocabulary the employee can understand

d. Initially and annually for each employee affected by the entry program


c. In a language and vocabulary the employee can understand

400

The employee must be provided with the required: site-specific instruction on PRCS entry, on-site supervised practice entries to this or substantially similar spaces, all equipment and supplies (including PPE), and:

a. An opportunity to verbally confirm with the entry supervisor that the space is safe to enter

b. A computer printout of the pre-entry atmospheric tests conducted and the instrumentation used

c. A continuous air monitoring device with audible and visible emergency alarms

d. An opportunity to review and understand the permit or certificate prior to entry into the space

d. An opportunity to review and understand the permit or certificate prior to entry into the space

400

All rescue team members must be trained:

a. As PRCS entrants and authorized attendants

b. To perform assigned rescue duties

c. In basic first aid and CPR, and have current certification

d. In actual or simulated practice rescues, at least twice annually

b. To perform assigned rescue duties

400

Which is a true statement according to the General Industry and Construction PRCS standards?

a. An off-site rescue service has to have a permit space program before performing confined space

rescues at the host employer’s site

b. An off-site rescue service must be able to provide on-site response within 5-10 minutes

c. The employer is responsible for evaluating and selecting a rescue team or service that is able to perform the needed rescue in a timely manner

d. The host employer must provide all equipment used for rescue operations by on-site and off-site

rescue services

c. The employer is responsible for evaluating and selecting a rescue team or service that is able to perform the needed rescue in a timely manner

M
e
n
u