Intro
Struck By
Scaffold
Scaffold
Mix
100

How many days to report a retaliation to osha

30 days

100

A class "B" fire is the burning of _________

Flammable liquids

100

Scaffold must support _____x the imposed load

4 times imposed load 

100

Scaffolds must be inspected ______ by ______

Before each use, competent person

100

What are the focus/fatal 4

Falls, struck, caught, electrocution

200

OSHA was founded in what year

197-

200

This document is used to determine what silica control methods are required

OSHA Table 1 

200

Trick question!!: Safety managers will put this certification title after their names (typically further proving their mental insecurities....)

CSP

200

You need to be tied off in this type of lift with this type of lanyard

Boom lift, yoyo 

200

This should be used to ensure the hazard controls in place are the most efficient

Hierarchy of controls

300

OSHA construction standard is 29 CFR _____ while general industry is _______

1926,1910

300

Masonry walls must have a __________ set up at ______ + ________

Limited access zone, 4 ft + height of wall

300

PPE should be utilized after what hierarchy of controls are considered?

Eliminate, substitute, Engineer, Administrative 

300

Scaffold planks must overlap the scaffold frame by _______ inches but a max of ______ inches unless prevented from walking to edge 

6 inches, 12 inches 

300

Outriggers are required when baker scaffolds are 

Doubled stacked 

400

Orientations should be delivered by this person to set a proper safety example on site 

Lead super/management 

400

A class "A" fire is the burning of _________

ordinary combustibles, wood, paper

400

Max allowable gap between scaffold planks is 

1 inch

400

Once scaffold is X times higher than the base, you need ______ or ___________

4 times

400

Competent person definition means they have 

Knowledge of hazard and authority to take action 

500

This log called _____ must be posted from _____ to _____ each year

OSHA 300 log posted from 2/1-4/1 

500

An increase of 5 db over the OSHA TWA causes the TWA to _______

Cut in half, 8 hr to 4 hr

500

A yellow tag on a scaffold means 

Tie off is required on scaffold


500

WT allows crossbraces as guardrails if at proper height 

NO!