PEDESTRIANS
BIKE and MOTORCYCLES
WORK DURATION
RAILROAD SAFETY
EQUIPMENT and LAYOUTS
100

This national accessibility guidance applies to pedestrians in public rights of way.

What is PROWAG, the Public Right-of-Way Accessibility Guidelines?

100

True or false: Bicycles generally have a legal right of access to highway facilities.

What is true?

100

This duration is long-term stationary work.

What is more than three days?

100

This dangerous traffic condition must never occur near railroad tracks.

What is Vehicles must never be stopped or queued on the tracks?

100

A spotter should establish these conditions with an equipment operator before movement.

What is Eye contact, acknowledgement, and continuous communication?

200

True or false: Signs or devices may be placed in an accessible pedestrian path.

What is false?

200

One of these surface conditions that may endanger bicycles or motorcycles.

What are Loose gravel, grooved or milled pavement, uneven surfaces, tack coat, steel plates, or abrupt lane edges?

200

This duration is intermediate-term stationary work.

What is more than one daylight period up to three days, or nighttime work over one hour?

200

The protected grade-crossing area extends _____ft   from the nearest and farthest rails.

What is 15 feet on each side?

200

The area a spotter must be able to see.

What is The entire backing (directly across from the work space) zone?

300

When a walkway closes, advance direction signs belong at this location.

What is At the nearest upstream crossing?

300

This special sign is required when hazardous motorcycle surface conditions exist.

What is Motorcycles Use Extreme Caution?

300

This duration is short-term stationary work.

What is More than one hour during one daylight period?

300

This method explains how a buffer space can be adjusted to prevent a queue from reaching the tracks.

What is extend the buffer upstream so the closure begins before the crossing?

300

This federal safety agency provides construction-equipment blind-area diagrams.

What is NIOSH?

400

This is how a temporary pedestrian route should compare with the existing route.

What is equally safe, convenient, and accessible to the greatest extent practical?

400

The motorcycle warning is repeated every _____ mile within the affected TTC zone.

What is Every one mile?

400

This duration is short-duration work.

What is Up to one hour?

400

This sign should be used on approaches to a railroad crossing inside a TTC zone.

What is Do Not Stop on Tracks?

400

This type of plan is appropriate for a unique roundabout operation.

What is a site-specific traffic control plan?

500

These three broad pedestrian duties appear on the certification exam.

What are meeting ADA requirements, avoiding work-vehicle conflicts, and providing a safe travel path?

500

True or false: The motorcycle warning must remain during nonworking hours while the hazardous condition remains.

What is true?

500

True or false: Short-duration work eliminates required warning signs and channelizing devices.

What is false?

500

This organization should be contacted early when work may affect a grade crossing.

Who is the railroad company or light-rail transit agency?

500

True or false: Routine flagging on bridges or elevated roadways is recommended.

What is false? It is not recommended.