What is your job title and department?
I am a Quality Engineer in the QA team.
Name one project you are working on.
I am improving the audit checklist.
What is the product you work with?
I work with medical tubing.
Name one material used in your product.
It's mainly made of silicone.
What is a non-conformity and non-compliance?
The first is when a product does not meet quality standards. The second is when guidelines are not followed.
Name one of your daily responsibilities.
I check if procedures are followed.
What is the goal of your current project?
I'm working to reduce quality errors.
What is the main function of this product?
It carries fluids safely in medical settings.
Why do you use this material instead of others?
It is flexible and resistant to heat.
Name one component of your product.
The product is composed of an outer tubing layer.
How do you contribute to the company’s success?
I ensure product quality and safety.
How does this project improve your work environment?
It makes quality checks faster and clearer.
Name one secondary use of the product.
It can also be used in lab testing environments.
What guidelines must suppliers follow?
Suppliers must provide certification and test results.
What happens if components are the wrong shape?
The component might not connect correctly to other parts of the product. The product could not work correctly as a consequence.
Give an example of a procedure you manage.
I manage the inspection guidelines.
What professional skills are you developing?
I am improving my data analysis and reporting.
Why is the design of this product important?
It must be flexible and durable for safety.
What could happen if the wrong material is delivered?
The product could fail and be unsafe.
Why is correct configuration important?
It ensures the product functions correctly and meets regulations and quality guidelines.
What can happen if procedures are not followed?
There could be safety risks or recalls.
Describe one challenge in your project.
It’s hard to get all departments to follow changes, so I'm trying to impliment changes slowly.
How do you test if the product works correctly?
It must be verified with a pressure and visual inspection.
What do you check before accepting materials from a supplier?
We check quality documents and do a sample test.
Give an example of a serious non-conformity risk.
A leak in the tubing could cause contamination.