Zero Harm Topics
Balfour Beatty & Current Projects
Cost Management
Site Utilization
Project Closeout
100

A picture and short description documenting safety related practices in the workplace.

What is a safety observation?

100

The country Balfour Beatty is originally from

What is the United Kingdom?

100

The software we use in tracking all project costs

What is Procore?

100

This is a living document that is updated with changing conditions and critical to planning the sequence of work on site

What is a Site Utilization Plan?

100

The time to begin thinking about Project Closeout

What is the beginning?

200

When performing work on an elevated surface this safety measure is required

What is being tied off/fall protection/fall arrest system?

200

The division where we currently are

What is the South East?

200

This is created in the cost tracking software once a cost impact is received

What is a Change Event?

200

The frequency that the Site Utilization Plan is updated

What is continually throughout construction?
200

The very first item that needs to be created to track closeout

What is the Submittal Log?

300

Wearing this protects each individual worker from workplace hazards.

What is PPE?

300

The name of the Autonomous Vehicle Project in Jacksonville

What is the Ultimate Urban Circulator / U2C?

300

The only way to change Balfour Beatty's contract value with Ownership

What is a PCCO (Prime Contract Change Order)/OCO?

300

Site Utilization Plan is initially developed during this stage

What is the Preconstruction Phase?

300
The duration of the typical warranty period

What is 12 months/1 year?

400

Where to find the Fact Sheet or Quick Card

What is OSHA?

400

The name of our most recently completed Student Housing Project

What is FIU University City Phase 2?

400

This document is issued to Subcontractors allowing them to bill for a change

What is a CCO?

400

The intended output of the Site Utilization Plan 

What is a communication tool?

400

Additional or extra items requested by the Owner to store for future use

What is Attic Stock?

500

An area of a construction site that only certain workers are authorized to access.

What is a CAZ/Controlled Access Zone?

500

This project is the largest single contract/non-join venture that Balfour Beatty has been awarded

What is the Broward County Convention Center and Hotel?

500

When you proceed with a change without receiving approval for Owner changes you create

What is Risk/sandwich?

500

The key of using and following the Site Utilization Plan  is to have

What is a Zero Harm Jobsite/Signature Experience?

500

During this phase, systems and components are tested, inspected, and adjusted to verify proper function

What is Commissioning?