Bidding
Vetting
YES/NO
Documents
Folder Organization
100

What does ITB stands for?

Invitation to Bid

100

What does the "Who" from the 4W package represent?

Who = Client

100
What to do if we decline on a project?

Communicate our decision with the client.

100

Which trade drawings are important for our work?

Demolition Drawings (Civil, Architectural, Structural, Mechanical, Electrical, Plumbing).

100

Where to find The Berg Corporation's bid folder template?

On the server (Z:) Company under estimating

200

What does RFI stands for?

Request for Information

200

What does the "What" from the 4W package represent?

What = Type of Project

200

Whare are the (3) steps after we accept an invitation to bid (ITB)?

Download all project documents.

Log project into Monday.com bid list.

Send 5 questions email.

200

What are as-built drawings?

Drawings from when the building was constructed.

200

What does the label of any specific project electronic folder should be written?

Project Name - Project Address

300

What's the 4W Package?

Who, What, Where, When?

300

What does the "Where" from the 4W package represent?

Where = Location

300

Once ITB is accepted, to which Monday.com board should the project name be moved to?

The Bid board

300

In regards to reports, what is the #1 report we look for during the bidding process?

Hazmat/Asbestos/Environmental Report

300

Under which folder should all the downloaded project documents be?

100___Downloads

400

What's an addendum?

A change or addition to a document

400

What does the "When" from the 4W package represent?

When = Project Due Date

400

What are the 5 questions?

Bid/Budget

Due Date

Site Visit

Start Date

Asbestos Report

400

Is an RFI (Request for Information) considered a document?

Yes.

400

How do we organize our project files?

By electronic folder sorted by the year we bid on the project.

500

Name the most used bidding software/platform.

Building Connected

500

What are the (4) main key dates?

Project Due Date, RFI Due Date, Site Visit, Start Date

500

Once ITB is accepted, what is the extent of file organization required?

Extraction of the main documents from all the files placing them on its respective folders.

500

What does specifications (Division 2) covers?

Existing Conditions

500

Will bidding documents become contract documents?

Yes