This is the fee charged for the installation of a grease trap
What is $1,000.00
Bonus-- full name
What is PIA
*Public Information Act Extra $100.00
This is used to determine if a SFD is 50% complete
what is a passed framing inspection
This is the contact that a permit should be mailed to
Who is the applicant
This is the individual who would download a copy of the trade permit after a revision is processed
Who is the intake staff employee who processed the record
The abbreviation MEP stands for
What is mechanical, electrical and plumbing plans
This form is used when a property owner wishes to construct their own SFD
What is a homeowner affidavit
This distance determines if a structure is attached to the principle structure
What is 3 feet
This is the formula used to calculate permit fees
What is (cost of work)- $25,000.00 x .007 + $140.00
What is pipe size
This is the scale a mobile home site plan is required to be drawn to
Fill in the blanks Cancellation requests are marked as _____ signed into ______ and placed _______
What is received
Who is Angie
Where is Cancellation bin in Angie's office
These are the reasons a permit is required for a fence (multiple)
1. What is a corner lot $50.00
2. What is over 6'h $50.00
3. What is a waterfront lot $50.00
4. What is non residential property $150.00
This color is used on GEO to mark County owed property
What is the color red
What is an EDU Worksheet
Anne Arundel County Follows this Building code year and this Electrical code year
What is 2018 building code $200.00
What is 2017 electrical code $200.00
This document is used to provide proof of being a non profit entity
What is a 501C3
What is a mezzanine
This following statement can be found in this policy "employees must use caution not to create the impression that they are speaking on behalf of the county"
What is the social media policy
This is how you would verify if capital connection charges have been paid (multiple steps)
1. Where is allocation review on bp $200.00
2. Where is payment tab on bp $200.00
3. No BP- what is have applicant contact DPW for verification $100.00
These documents are required as part of a pier package (mutliple)
1. What is a site plan $100.00
2. What is a Vicinity map $200.00
3. What is a Pier cross section $100.00
Fill in the blanks
Stormwater management agreements are marked as _______, signed into ________ and placed _______
what is received
who is aylin
where is Aylin's mailbox
These are the reviews required when finishing a basement *no window well* (multiple)
What is plans (always) $200.00
What is zoning *adding 2nd kitchen $100.00
What is Septic *if property is on septic $100.00
What is Engineering *When on mayo/grinder and adding bedrooms $100.00
DAILY DOUBLE!!!!
These are the required setbacks for a 30'H barn located in RA
What is
front- 55 feet $100.00
rear- 20 feet $100.00
side- 20 feet $100.00
corner side- 45 feet $200.00