PPE/Safety
SLC
Dock Operations
Rack Receiving
Misc.
100

This piece of equipment is used when putting BBUs in a lower shelf or when adjusting the feets of racks during SLC

What are knee pads?

100

This is the first thing one does when starting the SLC process on a rack.

What is claim the rack on IGO?

100

After scanning rack serials and completing the checklist, labels are placed here on the rack.

What is top of the rack and back of the rack?

100
Safety cones must be placed on top of this inside the data halls.

What are electrical vaults?

100

All incoming rack deliveries and potential turn down/moves are found here.

What is DC Console?

200

The specific restriction placed on an associate using a step ladder during rack receiving — even if they need to reach higher.

What is not reaching above their head to remove bolts?

200

This particular piece of PPE is required when working inside the data halls.

What is ear protection?

200

These are the 2 conditions that all rack legs on the dock must be before depalletizing. 

What is raised/up and taped?

200

This is done every time after all racks have been received and ran into their correct destination.  

What is putting the dock back into its original state (cleaned) and dunnage loaded on correct truck?

200

The minimum number of functioning latches required on a BBU case before it is considered acceptable for use.

What is 3 (out of 4)?

300

This is the needs to be done to all damaged or broken MHE

What is placed in quarantine and tagged out?

300

This needs to happen when placing an orv2 next to another orv2 while SLCing. (Daily Double)

What is one of the racks weatherstrips need to be removed for spacing purposes.

300

The exact moment during rack receiving when back plate bolts (non red) are permitted to be removed.

What is once the tug is attached and strapped?

300

These are the items checked in a three way match when receiving a rack.

What are ship to address, physical count of racks, and shreq number/asn file? 

300

The color of light that should appear after pressing the 'chk' button on each BBU during installation.

What is blue?

400

This is the only acceptable sharp object used to cut material on the dock.

What is a safety blade?

400

This is what needs to be done to the cable whips on top of a rack.

What is uncoiled and placed over the front of the rack?

400

The number of ratchet straps required per rack when securing racks inside a trailer.

What is two?

400

The steps required in IGO to create a delivery when it is not found in the system. (Daily Double)

What are clicking 'Create Delivery' and adding carrier, tracking number, and PO/Shreqs?

400

This is the training platform for all official Meta courses.

What is Cornerstone?

500

These are the four mandatory articles of PPE worn during dock operations.

What are cut/crush resistant gloves, safety glasses, ESD straps, hard/alloy toe shoes?

500

The position gap between a rack and another rack/containment panel is not to exceed this size. 

What is 1/2 inch?

500

This form needs to be filled out before doing any potential dangerous activity on the dock.

What is a LRAW form?

500

The four specific items the IGO team must record in the logical delivery record during rack receiving.

What are actual arrival time, unload time, and people involved, and seal number?

500

This is the chain of command for escalating any rack related issues.

What is L2 to L3 to Alex to FTE to SiteOPS (Chadwick)?