Building Facts
Locations
Amenities
Dates
Numbers
100

There are 16 of these in the building.

How many stories are in the Tower?

100

Surgery is located on this level

What is level 1?

100

The coffee shop, restaurant, gift/flower shop, auditorium, and sacred space will be located off this main spine.

What is the lobby?

100

The first patient will be moved to the Tower on this date.

What is Saturday, August 1, 2020?

100

Almost 1 Million

How many square feet are in the Tower?
200

These two floors are at the same elevation as the floors in the existing building.

What are levels Ground and 1?

200

Cath Labs, EP Labs, and Prep/Recovery are located on this level.

What is level 2?

200

Every area has one of these rooms, designed for staff to have a place to take a minute to decompress, or for lactation.

What is a respite room?

200

Construction is on target to be completed on this date.

What is May 5, 2020?

200

Over 1,000 people were involved in this phase of the Tower.

How many people were involved in the design of the building?

300

There are 2 of these special ORs in the building.

What is a hybrid OR?

300

To visit the helipad, I go to this level.

What is level Roof?

300

Conversations with families after a procedure take place in these rooms, with 8 on level 1 and 4 on level 2.

What is a consult room?

300

Design of the Tower started in this year.

When was 2016?
300

This superstitious number won't be used as a floor in the Tower.

What is 13?

400

There are 8 of these labs where patients with a STEMI are treated.

What is Cath Lab?

400

A patient in 4 East has a STEMI. What elevator will be used to get the patient to the Cath Lab?

What is the Transfer Elevator?

400

This staff amenity for people working on the patient floors looks westward, and has floor to ceiling windows.

What is the staff break room?

400

Per the Certificate of Need, all floors of the Tower will be up-fit by this year.

When is 2026?

400

These two floors in the Tower are for mechanical equipment only.

What are levels 3 and 9?
500

There are 132 of these opening on August 1, 2020

What are beds?

500

Sterile Processing, Supply Chain, and the discharge for the Trash and Linen chutes are located on this level of the Tower.

What is Ground?

500

This amenity is for visitors and staff to step away, make a personal phone call, read, or relax while a patient has a procedure. There are 2 of them on each patient floor: one faces south toward downtown and one faces north toward Buckhead.

What are the sunrooms?

500

This is the month and year the board approved this building to be constructed.

When is November 2015?

500

There are 390 of these under the building.

What are valet parking spaces?

M
e
n
u