THIS RIGID PROTECTIVE HELMET, IS WORN BY FACTORY AND BUILDING WORKERS.
WHAT IS A HARD HAT?
AN ALTERNATIVE MECHANISM FOR DIRECTING THE CONTRACTOR TO PERFORM ADDITIONAL WORK TO THE CONTRACT WHEN TIME AND/OR COST OF THE WORK IS NOT IN AGREEMENT BETWEEN THE OWNER AND THE CONTRACTOR PERFORMING THE WORK.
WHAT IS A (CCD) CONSTRUCTION CHANGE DIRECTIVE?
THIS PLATFORM PROVIDES A CLOUD-BASED, HUB-TO-HUB, AND A GLOBAL PLATFORM TO DELIVER BUSINESS-TO-BUSINESS (B2B) COLLABORATIVE PROJECT MANAGEMENT SOLUTIONS.
WHAT IS KAHUA?
THIS REPORT IS DUE WITHIN 24 HOURS OF A CONTRACTOR SAFETY INCIDENT.
WHAT IS THE EHSYNC REPORT?
10% IS THE FORECAST CAPITAL BUDGET ACCURACY OF THIS FORECAST PLANNED SPEND.
WHAT IS THE MONTHLY FORECAST PLANNED SPEND?
THE LIGHT AND HEAT PRODUCED AS PART OF THIS TYPE OF FAULT, IS A TYPE OF ELECTRICAL EXPLOSION
WHAT IS AN ARC FLASH? (ALSO CALLED A FLASHOVER)
THE GROUP OF INDIVIDUALS WITHIN A PROJECT TEAM OR GROUP WHO ARE RESPONSIBLE FOR MAKING THE ULTIMATE DECISION AS TO WHEN AND IF ANY PARTICULAR CHANGES ARE TO BE MADE IN REGARDS TO WORK SCOPE, BUDGET OR SCHEDULE.
WHAT IS A (CCB) CHANGE CONTROL BOARD?
THIS PLATFORM IS A WEBSITE-BASED COLLABORATION SYSTEM THAT USES WORKFLOW APPLICATIONS, “LIST” DATABASES AND OTHER WEB PARTS AND SECURITY FEATURES TO EMPOWER BUSINESS TEAMS TO WORK TOGETHER.
WHAT IS SHAREPOINT?
THIS REPORT IS DUE ON THE 9TH BUSINESS DAY OF THE MONTH.
WHAT IS THE MONTHLY FORECAST PLANNED SPEND?
CBRE STRIVES FOR THIS PERCENTAGE OF ACCURACY IN BOTH THE MONTHLY AND QUARTERLY FORECAST PLANNED SPEND.
WHAT IS 5% ACCURACY?
THIS TYPE OF MOVEMENT IS HEARD WHEN PIPES CLANG INSIDE WALLS OR FLOORS, WHICH GRADUALLY WEAKEN JOINTS IN THE PIPE UNTIL ONE FAILS.
WHAT IS A WATER HAMMER?
A TELEVISION SYSTEM IN WHICH SIGNALS ARE NOT PUBLICLY DISTRIBUTED BUT ARE MONITORED, PRIMARILY FOR SURVEILLANCE PURPOSES.
WHAT IS A (CCTV) CLOSED CIRCUIT TELEVISION?
THIS PROJECT MANAGEMENT SOFTWARE PRODUCT IS DESIGNED TO ASSIST A PROJECT MANAGER IN DEVELOPING A SCHEDULE, ASSIGNING RESOURCES TO TASKS, TRACKING PROGRESS, MANAGING THE BUDGET, AND ANALYZING WORKLOADS.
WHAT IS MICROSOFT PROJECT?
THIS REPORT IS DUE AT THE END OF THE FIRST WEEK OF THE MONTH.
WHAT IS THE COST LOADED SCHEDULE
SCE EXPECTS THIS PERCENTAGE OF MONTHLY PROJECT CLOSURES TO BE ACCEPTED BY THE CLIENT ON FIRST SUBMISSION.
WHAT IS 90%?
ASIDE FROM EARTHQUAKES, THIS THE LEADING CAUSE OF THE BUILDING DAMAGE AND FAILURES.
HAT IS THE WIND (STORMS)?
THIS IS A WAY OF SENDING ADDITIONAL COPIES OF A CORRESPONDENCE TO OTHER PEOPLE.
WHAT IS A (CC) CARBON COPY OR COURTESY COPY?
THIS AMERICAN COMPANY HEADQUARTERED IN SAN FRANCISCO, HELPS ORGANIZATIONS CONNECT AND AUTOMATE HOW THEY PREPARE, SIGN, ACT ON, AND MANAGE AGREEMENTS.
WHAT IS DOCUSIGN INC.?
THIS TASK IS DUE NO LATER THAN THE 20TH OF EVERY MONTH.
WHAT IS SAFETY TRAINING?
SCE REQUIRES 100% MONTHLY AND QUARTERLY COMPLIANCE WITH THIS KPI.
WHAT IS EHS COMPLIANCE?
THE PROCESS OF TEMPORARILY SUPPORTING A BUILDING, VESSEL, STRUCTURE, OR TRENCH WITH PROPS WHEN IN DANGER OF COLLAPSE OR DURING REPAIRS OR ALTERATIONS.
WHAT IS SHORING?
THE CONTRACTOR PREPARES THIS DOCUMENT QUOTING A PRICE FOR THE EXTRA WORK. ONCE THE OWNER AND CONTRACTOR HAVE AGREED ON SCOPE, PRICE, AND SCHEDULE, A FORMAL, WRITTEN CHANGE ORDER IS PREPARED AND SIGNED BY ALL PARTIES.
WHAT IS A (CCR) CONTRACTOR CHANGE REQUEST?
THIS PLATFORM PROVIDES AN ONLINE EDUCATION, TRAINING AND PERFORMANCE SUPPORT SOLUTIONS FOR A WIDE RANGE OF INDUSTRIES INCLUDING ARCHITECTURE, ENGINEERING, CONSTRUCTION, INDUSTRIAL, FACILITIES MANAGEMENT AND IT AND SECURITY FIELDS.
WHAT IS RED VECTOR?
THESE DOCUMENTS ARE DUE WITHIN 90 DAYS OF A REPORTED IN-SERVICE DATE.
WHAT IS THE PROJECT CLOSE-OUT PACKAGE?
THIS IS SCE'S MINIMUM ACCEPTABLE PERCENTAGE FOR PROJECT SCHEDULE ADHERENCE TO MAKE SURE ALL CONSTRUCTION FINISH MILESTONES ARE TO DATE.
WHAT IS 90%?