True or False all of the proposed linework is on the Civil Site Plan?
False
What is the main purpose of a sheet index?
List the sheets contained in the plans
What is another name for a dowel hole?
Block out, Beam pins, Bolt Hole
No
Where can I find how many acres the site is?
Cover Sheet
What sheet should be used to layout LOD and what phase?
How do you calculate slope percentage
Rise divided by run
After the pile is set whats the next step for a surveyor?
As-built
If there is a proposed island on the cross section is the CL elevation to the top of the island?
No it is to the Top of asphalt under the island
Where would you find project wide requirements that apply to multiple sheets? Think general requirements.
General Notes
What sheet gives me information for existing manhole elevations and contours?
Existing Conditions
What plan sheet do you use to find striping linework
Signals and markings
What is the B.F.P.R?
Back Face Paving Rest
If you cross section and mainline profile contradict each other what should you use?
None of them send an RFI
What page gives leaders/call outs for curb and gutter?
The Site Plan
Your asked to stake a sewer line what sheet shows grades for your manholes?
Sewer Profiles
What vertical offset do you use to get to the subgrade elevation If the typical shows:
A= recycled Asph 12.5mm at 165 lbs/sy
B=Recycled Asph 19mm at 220 lbs/sy
C=Recycled Asph 25mm at 330lbs/sy
D=Graded Aggregate Base, 12"
18.5 inches or 1.54
When laying out the B.F.P.R and the wing walls what stakes should you use? and do you need grades?
Mostly Hub and Tack (rebar & Cap when applicable) and no grades
When do you stop using the 18 series for grades in transportation projects
When the spot elevations end
on most transportation jobs where can you find the depths for driveways?
General Notes
You find the feature you're staking on the site plan. Beside it is a callout referencing another sheet.
The site plan appears to give you enough information to stake it.
Question: Do you still need to follow the callout? Why?
Yes. the referenced sheet may contain additional information like dimensions, elevations, offsets, etc.
If you are asked to verify the EP elevation in the field how would you find what the EP elevation is suppose to be if your cross section CL elevation is 1200.65, you have a 12' lane and you roads slope percentage is 2%?
1200.875
What 5 things must be laid out before laying out the bearing pad?
Pile, Footing, Column, Cap, Dowel hole
1100.48
Whats the Midpoint station of SR 211?
93+25