This OSHA standard is designed to prevent catastrophic releases of highly hazardous chemicals.
Process Safety Management (PSM)
What type of contractors does the PSM program NOT apply to?
Contractors providing incidental services which do not influence process safety, such as janitorial work, food and drink services, laundry, delivery, or other supply services.
equipment covered under the PSM program.
The equipment from the unloading skid to the Ammonia injection grid.
A permanent or temporary MOC must be initiated within ___ days of the emergency MOC.
10
Has limited or restricted means for entry or exit and is not designed for continuous employee occupancy.
Confined Space
This term describes any change that does not require an MOC because thew equipment is replaced with the same exact part meeting the same design specifications.
Replacement in-kind
Name the attachment and/or form tittle, used to evaluate the safe work performance during the course of the contractor’s work and at least annually thereafter.
Attachment L, Contractor Job Evaluation
How long shall mechanical integrity records be kept?
All mechanical integrity records shall be maintained for the life of the process.
An addition, modification, or removal of an item (chemical, equipment, procedure, security measure, PSI, etc) which is not a replacement in kind (RIK)
Process change (PC)
This procedure outlines the protocol for reporting a fire or other emergency, emergency evacuation, including type of evacuation and exit route assignments, and is to be followed by employees who remain to operate critical plant operations before they evacuate, etc.
Emergency Action Plan (EAP)
Any change to chemicals, technology, equipment, and procedures that affect a covered process requires this form.
Management of Change (MOC)
Name the attachment and/or form tittle, of the standardized log developed to capture contractor injury and illness history while working on or adjacent to a covered process.
Attachment M, Contractor Injury and Illness Log
The purpose of the Mechanical Integrity Procedure.
To implement a mechanical integrity program that includes quality assurance for new equipment fabrication and installation, as well as maintaining the ongoing integrity of process equipment.
A change intended to be in place for a specified and limited amount of time.
Temporary change
This process safeguards employees from the unexpected energization or release of hazardous energy during machinery maintenance.
Lock Out Tag Out (LOTO)
This analysis looks at what can go wrong and is revalidated every 5 years.
Process Hazard Analysis (PHA)
This distance makes a contractor "covered" and requires full PSM control?
Bonus: What form must be filled out for this?
35 feet
Bonus Answer: Attachment K, Program Evaluation Form
Name the attachment and/or form tittle that identifies the minimum acceptable mechanical integrity requirements for the components of a covered process using.
Attachment C, Anhydrous Ammonia - Inspection, Testing, and Preventative Maintenance Activities
Each MOC form shall be completed along with.
Plant Review Board (PRB)
Any activity performed on or within 35 ft of a covered process that involves open flames, welding, burning, grinding, or similar activities capable of generating sparks, heat, or flames that may result in a fire.
Hot work
Before using new or modified equipment under an MOC, this safety check must be completed.
Pre-startup safety review (PSSR)
At the start of the contractor’s awarded job at the facility, and at least annually thereafter, each facility shall ensure and document that the contractor employer has:
1. Provided training to each of contractor’s employees in the work practices necessary to safely perform their job (Generation Safety, Health, and Environmental Orientation Checklist).
2. Instructed all contractor’s employees in the known hazards related to their job and the process.
3. Has received and understands Anhydrous Ammonia training.
4. Attachment K, Safety Job Evaluation Form
5. Contractors let us know of any hazards, through Attachment III, Contract Administration Checklist for Project Management.
What information is needed in the work order log.
1. Date of the inspection or test.
2. Name of the person who performed the inspection or test.
3. Serial number or other identifier of the equipment on which the inspection or test was performed.
4. Description of the inspection or test performed.
5. Results of the inspection or test.
6. Supporting documentation (attachments)
What is required to close out an MOC.
1. Open MOC
2. Approved PRB item
3. Completed action items
4. Log, closed out MWO, with attachments
5. Required signatures
This program is required when any work is performed on temporary walking-working surfaces or equipment above 4 feet off the ground.
Fall Protection Program