100

When the logic preceding a(n)   ?   instruction changes from true to false, it stops timing and the accumulated value is reset to zero.

TON

100

Analog actuators are connected to the   ?   terminals of a PLC and receive analog signals from the output section.

Analog output

100

There is/are   ?   method(s) for terminating device and component wires at a PLC.

3

100

The project tree consists of folders and files that contain all of the information about the PLC program named in the   ?   bar.

Title

100

 ?   are one of the most common sources of intermittent PLC problems.

Loose connections

200

Counter instructions are located in data table file   ?  .

5

200

The number of analog input and output terminals corresponds with the   ?   of the PLC.

Size

200

When the power status indicator light is on, the problem is   ?  .

the programmable controller is not in run mode

200

 ?   buttons can also be used to move the contents of a window by clicking on the buttons for right/left or up/down movement.

Scroll

200

As part of a visual inspection, use   ?   to remove dust and contaminants from PLCs and enclosures.

an electrostatic discharge (ESD) safe vacuum

300

The accumulated value of a CTD instruction decreases by one for every   ?   transition of the logic preceding a CTD instruction on a rung.

False to true

300

The instructions, any other documentation, and software should be removed and any paperwork   ?  .

Stored in safe location

300

The TECO PLC error code for “FBD code logic check error” is   ?   ERROR.

LOGIC

300

A common mistake is to choose the Force Off option instead of the   ?   option.

Remove Force

300

When checking the PLC power supply and processor LEDs,   ?   must be ON.

POWER and RUN

400

Math instructions have   ?   source(s) and a destination for the result of the calculation.

2

400

PLCs are mounted   ?   and the top of the PLC facing up on the door or inside wall of the PLC enclosure.

horizontally with the name of the manufacturer facing out

400

 ?   is more than a 10% decrease in voltage for 0.5 cycles to one minute.

Voltage Sag

400

Forcing used during   ?   verifies that the wiring to input devices and output components is in working order.

Startup debugging

400

The   ?   of a PLC monitors battery voltage level.

processor

500

A(n)   ?   instruction operates independently of the PLC processor scan.

HSC

500

Conductors that are run from the PLC enclosure to another location should be in a(n)   ?   conduit regardless of the signal type or voltage level.

Metal

500

  ?   is temporary unwanted voltage on a power line for a very short period of time.

Transient voltage

500

Software maintenance covers the   ?  .

PLC Program

500

Equipment that is required for PLC programming includes   ?  .

all of the above