Submittals
Drawings
RFIs
QS Grab bag
PM Grab bag
100

The place to make edits to when submittals will send out emails 

What is the submittal configuration settings?

100

These users can view unpublished drawing markups

What is the user that created them?

100

What RFI stands for

What is a Request for Information?

100

This tool is used to keep track of potential safety related issues or document unfortunate accidents

What is Incidents?

100

Place where meeting templates are created and managed 

What is the company level Admin tool?

200

Submittals can be automatically created from this other Procore tool

What are specifications?

200

This is how to upload a drawing revision

What is uploading a new drawing with a drawing number that is already in use on the project?

200

This user is responsible for marking responses as official 

What is an admin or the RFI Manager?

200

Time of the project that the Punch List tool is used

What is project close out?

200

This tool integrates with Navisworks and provides a 3D representation of the clients project

What is Models?

300

Role given to a user that is added to a workflow by another user with the forward for review feature

What is a reviewer?

300

These users are notified when new drawings are added to the published in the project

What are drawing log subscribers?

300

RFIs can be created while looking at the plans on a project using this feature

What is a drawing markup?

300

This tool uses fillable PDFs that can not be created in the Procore platform

What are Forms?

300

Doing this prevents an item form carrying over to a follow-up meeting 

What is marking the item as closed?

400

Editing this will change the final due date of the submittal 

What are the dates in the workflow?

400

Adding these can allow you to have two different drawings in your project with the same drawing number 

What are Drawing Areas?

400

If a user did not recieve an email from an RFI a rep can check here first to see if it should have been sent

What is the email matrix in the configuration settings of the RFI tool?

400

These can be created at the company or project level and gives a checklist for users to fill out in their projects to ensure quality or safety standards have been met

What are inspection templates?

400

This tool is just a viewer of another programs file and all edits to need to be done outside of Procore and then upload a new file 

What is the Schedule tool?

500

Only these users will be able to mark up a submittal 

What is the ball in court?

500

The "Drawing Sets" tab allows you to see all drawings added to each set whereas this tab will only show you the most recent drawings on the project in every set 

What is Current Drawings?

500

Users can reply to an RFI in Procore or they can do this

What is reply to the RFI email?

500

This can be set up to limit the log types that can be created by subcontractors in the Daily Log

What is collaborator entry?

500

These must be configured before you have the ability to create Instructions on your project

What are Instruction Types?