Patient Handling
Shift Expectations
PCR Completion
100

_________ equipment should be secured while the ambulance is in motion 

what is All?

100

Some that should be close when leaving the base

What are bay doors?

100

This is the general time standard for completing PCRs after a call

What is by end of shift (or within 24 hours)?

200

This number of providers is required when lifting a stretcher with a heavy patient

what is 2 or more?

200

Something you should check at minimum once a shift when at work.

What is your email? 

200

The person you should contact if you cannot complete your PCR in a timely manner.

What is your shift supervisor?

300
A phrase that helps ensure that lifting is performed in unison. 

What is "Ready, Brace, Lift" ?

300

Chute time between 0700 and 2200

What is 60 secs

300

This required to be shredded immediately after PCR is complete. 

What is PHI?

400

The part of your body that you should be using to lift.

What is your Legs?

400

Special base duty for Thursday  

What is deep clean of the kitchen?

400

Minimum number of vitals and assessments for a pt transport.

What is 2?

500

This policy prevents lifting injuries and requires use of mechanical aids when possible.

What is the safe patient handling policy?

500

You should do this for the oncoming crew before leaving

What is provide a thorough report and truck status?


500

Three kinds of signatures should be obtained for a PCR (with transport) 

what is Crew, HIPPA/Billing, and Facility?

M
e
n
u