Methodologies
Project Management
General topics
Cultural
Random
150

Define UI-UX

User Interface & User Experience

150

Define PMO

Project Management Office- (PMO) is an organizational structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques. The responsibilities of a PMO can range from providing project management support functions to the direct management of one or more projects.

150

Mention two core skills in 2025, saw during class

Analytical thinking, resilience, leadership and social influence, creative thinking, motivation and self-awareness

150

Biggest world ocean? 

The Pacific Ocean is the largest and deepest of the world ocean basins. Covering approximately 63 million square miles and containing more than half of the free water on Earth

150

What are hallucinations in AI

Words or phrases generated by a model that sometimes do not make sense or are grammatically incorrect. Could be caused due: insufficient data, inaccuracy, context and restrictions. 

200

Enlist the 9 components of BM-Canvas

Customer Segments, Value Proposition, Revenue Streams, Channels, Customer Relationships, Key Activities, Key Resources, Key Partners, and Cost Structure.

200

What is a RACI? 

A RACI chart—also known as a responsibility assignment matrix—is a diagram used in project management to define team roles across 4 categories: Responsible, Accountable, Consulted, and Informed.

200

Design thinking steps

Empathize, Define, Ideate, Prototype and Test. 

200

Which is the largest planet in our solar system 

Jupiter

200

Who originally painted the Scream (1893)? 

Edvard Munch.

300

"This framework emphasizes iterative development and continuous improvement."

Scrum (Agile)

300

What is CPM

The critical path method is a technique that allows you to identify tasks that are necessary for project completion. The critical path in project management is the longest sequence of activities that must be finished on time to complete the entire project.

300

Mention 3 quality tools reviewed in class

Group #1: Quality Metrics or Flow charts

Group #2: Root Cause Analysis

Group #3: Cause & Effect (Ishikawa)

Group #4: Scatter diagrams

Group #5: Histograms

Group #6: Audits/ Six Sigma

Group #8: Pareto Chart

300

How was the city of Istambul named before 1923

Constantinopla

300

Which is the deadliest animal for humans?

Mosquitoes (more than 1,000,000 p year)

400

Enlist the 4 processes of scope mgmt according to PMI

Plan scope mgmt

collect requirements

Define scope and create WBS

Validate and Control scope

400

Mention 4 PM trends reviewed in class

Power Skills

Data and Analytics

AI in PM such as: AI-Powered Decision Support, Automated Resource Allocation and forecasting, Task Monitoring and Reporting, Efficient documentation management, client engagement.

Hybrid approaches: Challenges related to manage remote and office stakeholders. Global talent Pools, flexibility and work/life balance, Workplace inclusivity, clear communication protocols, security and compliance.

400

Define prompt engineering

AI concept in AI which encompasses the techniques and skills required to optimize the results we obtain from our interactions with LLM.

400

Biggest living being on earth? 

considered to be the "Pando" or "Trembling Giant," which is a clonal colony of quaking aspen trees (Populus tremuloides) in Utah, United States. Pando covers approximately 106 acres (43 hectares) and is estimated to weigh around 6,000 metric tons. While it consists of many individual trees, genetically, they are all identical and connected by a single root system, making Pando one massive organism

400

Enlist the 4 diversity E's reviewed in performance mgmt

Enhancement

Empathy

Exploration

Esteem 

500

Define Agile and at least 2 differences from Waterfall approaches. 

Agile methodology is an iterative and flexible approach to project management that focuses on delivering incremental value throughout the project's duration. It emphasizes adaptability, collaboration, and continuous improvement.

Flexibility: Changes during course

Collaboration: Regular comms and feedback

Iterative dev: Iterations and Sprints allowing incremental product releases

Customer Focus: Emphasis on customer satisfaction.


Waterfall: 

Sequential: step by step progress

Comprehensive planning: upfront planning with objectives and requirements defined in advance

Document Driven: BRD, design docs, Project plans.

Less cx involvement: Occurs mainly at Project initiation.


500

Write both formulas: Triangular distribution and Beta distribution

•Triangular distribution. cE = (cO + cM + cP) / 3

• Beta distribution. cE = (cO + 4cM + cP) / 6

500

Which are the two types of contingencies reviewed in risk management? 

Budget reserves: Set up to cover identified risks, allocated to specific segments or deliverables of the Project.

Management reserves: Set up to cover unidentified risks and are allocated to risks associated with the total Project. Usually a 10% of overall cost.

500

What is the significance of the Mona Lisa in art history?

It represents the pinnacle of Renaissance art and is admired for its technical mastery, composition, and psychological depth.

500

Complete the phrase: Only __ of risks are unpredictable

10%

M
e
n
u