Procedure Requirements
Risk Levels
Procedure Approval
Roles and Responsibilities
100
Per the AP, this specialized font indicates communication with teams external to the field Operators. 

What is "Green Underline Font" 

100

This risk level does not need review beyond site level management, and does not pose an elevated risk to the client

What is "Low Risk"

100
This individual cannot be involved in the authoring or brainstorming process for a procedure. 

What is "the peer reviewer"

100

This individual is required to review all applicable technical documentation to ensure the procedure is written accurately. 

What is "the Author" 

200

In a procedure, this specialized font is used to emphasize and identify the equipment name when performing an action or change of state

What is "Bold Font" 

200

As the result of a specific TSO, any work involving this system is classified as High Risk 

What is "Medium Voltage" 

200

Who, specifically, can peer review a site-level procedure per the Procedure Program AP? 

What is "Any person who has completed the S2 qualification that specifically pertains to the system being operated"
200

This individual performs all physical actions during the execution of a procedure 

What is "the Operator"

300

This unique step is required at any point in a procedure where the result of a step, intended or unintended, could result in SLA impact

What is "dual operator and controller initials" 

300

This activity, commonly performed on construction sites throughout all phases, is considered high risk as soon as the first phase of a facility is occupied by Operations

What is "a crane lift" 

300

In the event that a COM must be involved in the procedure authoring or brainstorming process, who is qualified to be the final approver on a procedure?

What is "the Regional Director or Vice President of Operations"

300

This individual is responsible for reading the procedure steps out loud, and MUST understand the expected outcome of each action taken.

What is "the Controller"

400

This series of steps is required whenever load is transferred from one source of power to another. 

What is "pre and post transfer load verification" 

400

Work classified as this risk level requires approval from the Regional Director, the Regional Vice President, and the Senior Vice President of Operations. 

What is "Medium Risk"

400

After a procedure is reviewed and approved in CAB, what is the NetSuite "Status" updated to by the chairperson?

What is "CAB Approved" 

400

This individual oversees the whole evolution, from coordinating the dry run of the procedure to briefing the incoming team if work continues to the next shift 

What is "the Controller"

500

This information is required to be included in all procedures that require physically operating any equipment in the facility. 

What is "PPE Requirements" 

500

Common work classified as this risk level includes de-energizing both sources of power for a dual-corded device, operating an EPO, or Medium Voltage Switching.

What is "High Risk" 

500

After the final review is complete on a procedure, what is the last administrative step before a procedure is considered "approved" (Prior to CAB)

What is "updating the status to approved in the playbook"

500

This individual must complete an administrative review of the procedure within 24 hours of completion. 

What is "MOP/SOP/EOP Supervisor"