Process Engg
Process planning
Capacity
Processing Methods
100

Which of the following is not the function of process Engg.

a) Equipment Monitoring 

b) New Equipment Installation

c) Forecasting of Demand

d)Research And Development

c) Forecasting of demand

100

Identify the correct steps of process planning 

i) Make or Buy Decision

ii)Machine Capacity

ii) Research and development

a) i) ,ii) and iii)

b) i) and ii)

c) i) and iii)

d) all of the above

b) i) and ii)

100

Identify the correct answer for the following statement: All planned stoppages under the normal working time frame are taken into consideration. This can also be known as available capacity.

a)Designed Capacity

b) Actual capacity

c) Effective Capacity

d) Required capacity

c) Effective Capacity

100

Product is moved sequentially along the line and stops at work centers along the line where an operation is performed is related to which type of manufacturing process

a) Continuous Flow Processing

b) Assembly line Processing

c) Fixed Position Manufacturing

d) None of the above

 




b) Assembly line Processing

200

Which function of process engineering is this:

monitor and evaluate all extant processes and equipment, and develop more streamlined, economical processes – if at all possible.

a)Equipment monitoring 

b)Simulating new processes with software 

c)Continual evaluation of all processes and equipment 

d)Writing and editing documentation 

c)Continual evaluation of all processes and equipment

200

The selection of process depends upon:

a)Current production commitments

b)Quality standards

c)Quantity to be produced

d) All of the above


d) All of the above

200

Maximum machine capacity is 

a) 158 hrs/week

b) 68 hrs/week

c) 168 hrs/week

d) 188 hrs/week

c) 168 hrs/week

200

Assembly process is an example of method

a)method used in large-scale manufacturing such as the manufacture of an aircraft or ship.

b)in which parts are added as the semi-finished assembly moves from workstation to workstation

c) in which the products that are manufactured cannot be removed from the production line and stored

d) in which wide range of products that can be modified based on the customers' requirements

b)in which parts are added as the semi-finished assembly moves from workstation to workstation


300

Identify the incorrect function of product Engineering

a)Design the product for cost

b)Design the product for customer satisfaction

c)Design product for function

d)Design the product for risk taking

d) Design the product for risk taking

300

Identify the incorrect factor which affects the process planning

a) According to the no. of output produced, the process planning is decided.

b)The part strength also decides that which type of process is employed for producing it

c)While selecting the process, full capacity of existing machines & its tooling must be utilized

d)Wide range of products that can be modified based on the customers' requirements

d)Wide range of products that can be modified based on the customers' requirements

300

Which of the following are factors responsible for machine selection

i)quantity of production required and its duration,

ii)Longer unproductive life of machine.

iii) Safety features in machine

iv)Minimum setup and put away times

a) i),ii),iii) and iv)

b)i) , iii) and iv)

c) ii), iii) and iv)

d) i), ii) and iv)

b)i) , iii) and iv)

300

Which of this is not the part of assembly chart

a) It lists all major materials and components, subassembly operations

b) is ideal for getting a bird’s eye view of the process

c) It is ideal for designing the product

d) very useful for understanding the sequence of component to be assembled.

c) It is ideal for designing the product

400

Defined as the process of designing and developing a device, assembly, or system such that it be produced as an item for sale through some production manufacturing process. is the definition of

a) Process planning

b) Process Engg

c) Product Engg

d) Production Engg

c) Product Engg

400

Defined as the systematic determination of the process by which a product is to be manufactured economically and competitively. is a definition of

a)Process Engineering

b)Operation planning

c) Process Planning

d) Product planning

c) Process Planning

400

Out of the following which is not the factor which affect the plant capacity

a)operational problems

b)Research and development

c)location of the plant

d)environmental safety


b)Research and development

400

Manufacture of automobiles and other transportation equipment is an example of 

a) Assembly Process

b) Continuous Production

c) Assembly Chart

d) None of the above

a) Assembly Process

500

Which of the following is not the function of product engg.

a) Product Conceptualization

b) Maintenance and Support

c) Product Designation

d) Product delivery

c) Product Designation

500

Which of the following factor is not responsible for selection of machine

a) Assembly drawing of the machine

b)Production rate and cost of production

c)type of operation that is performed on machine

d) ) Cost of the machines

a) Assembly drawing of the machine

500

Which of the Following measures that could be taken to balance the plant capacity.

i) Use of multiple shifts for carrying out the production.

ii)Use line balancing techniques

iii) Use various demand forecasting techniques

iv) Identify temporary storage facilities

a) i) and ii)

b) iii) and iv)

c) i), ii) , iii) and iv)

d) i), ii) and iv)

c) i), ii) , iii) and iv)

500

Identify the in correct statement for the relationship between process and machine selection

a) Depending up on type of machine, process is selected

b) If the process wants lower rejection than similarly select the machine

c) Depending up on the type of production the machinery will be selected

d) Process or the production timing also responsible for the selection of machine


a) Depending up on type of machine, process is selected