PHA
PHA Advanced
CG Specific
More PHA
CG General Safety
100
What does PHA stand for?
What is Process Hazard Analysis
100
Writing work instructions WCI's
What is an example of employee participation in Process Safety Process
100
A critical piece of equipment that is responsible for converting VOC's to safe levels
What is the RTO (Regenerative Thermal Oxidizer)
100
Hazop
What is a Hazard and Operability Study
100
How often do you inspect a fork truck for safety
What is "Once per shift"
200
Employees with experience and knowledge specific to a process
What are (who are) qualified PHA Team Members
200
Being a Team Member in a PHA
What is an example of employee participation in Process Safety Program
200
A system that automatically stops a fire or dust explosion
What is a suppression system...CG has CO2 and N2 suppression systems.
200
Reviewing process incident history and changes to a process (MOC)
What is important when revalidating a process using a PHA
200
ORI stands for...
What is Operational Readiness Inspection
300
Employees with knowledge specific to the PHA methodology, like Hazop, "What if", FMEA
What are qualified PHA Team Members - such as facilitator or scribe
300
A PHA shall identify and include in every PHA (pick one of 6 answers)
What are either: Hazards of the Process, Previous incidents, engineering & administrative controls and consequences of their failure, facility siting, or human factors
300
LEL monitor
What is Lower Explosive Limit monitor - ovens have LELs that continuously monitor for percent of the LEL
300
Being on a PHA team or writing work instructions for a process
What are examples of employee participation
300
ORI is another name for a common process safety step
What is a Pre-Startup Safety Report or PSSR
400
5 Years
What is the time between PHA's a.k.a the revalidation period
400
Chosing the correct location for a process with regard to other adjacent processes
What is known as siting
400
Dissipates electrical or static energy
What is a grounding system or a static dissipative device
400
FMEA
What is Failure Mode & Effects Analysis
400
MOC stands for...
What is Management of Change...a process to document changes
500
Typical PHA Team Members
What are (who are) : Employees with experience and knowledge specific to the process or with experience and knowlege specific to the PHA methology
500
One very important factor to consider when performing a PHA involving personnel
What is Human Factors
500
LC
What are the initials of your Plant Manager
500
What if
What is an example of a PHA methodology that uses brainstorming techniques to complete a PHA by continuously asking the question, "What if".
M
e
n
u