PLC's
BLT's
CDL's
OTPHJ's
PLC's one more time
100

PLCs provide rigid control for cycle automation, minimizing   ?  .

Manual Intervention

100

Why must technicians wear insulating electrical gloves and use insulated tools and test instruments when working around a PLC?

To protect from electrical shock

100

A   ?   switch circuit typically uses a sink or source transistor as the switching device.

3 wire input

100

A   ?   PLC typically has 129 I/Os to 512 I/Os.

Medium

100

Analog signal types include all of the following except   ?  .

10 mA to 20 mA

200

PLCs on elevators are loaded with sets of ladder logic instructions that detect   ?  .

d. the different floors requested and direct the lift to move accordingly

200

Manufacturers of PLCs often specify a grounding system with a resistance of   ?   or less.

all the above

200

What is the programming symbol for an input device (normally closed)?

see picture

200

 ?   is the section of the operating cycle during which a PLC performs memory management and updates timers and counters.

Housekeeping and overhead

200

Within the data table files,   ?   of the files are default files.

9

300

The output sections of   ?   PLCs have six relay contacts.

Micro-

300

Per Occupational Safety and Health Administration (OSHA) standards, equipment is locked out and tagged out before   ?  .

Preventative Maintenance

300

Normally open (NO) switches that are   ?   operated show the operator drawn below the terminals of the switch.

either A or C

300

A(n)   ?   device converts one form or level of energy to another form.

Interface

300

The   ?   is reserved by the CPU for processing data.

reserved file (file 1)

400

Extra care must be taken when using a   ?   command because it overrides all safety features and protocols designed into a program.

Force

400

In a   ?   circuit, current stops flowing any time a fuse blows, a circuit breaker trips, or a switch opens.

Series

400

Any normally open (NO) switch that is   ?   operated will have the operator of the switch drawn above the terminals of the switch.

Manually

400

An example of a(n)   ?   circuit is a two-way switch used to control a lamp.

Digital

400

A timer instruction consists of three words, each with   ?   bits.

16


500

Rack-mounted modules connect to medium or large PLCs through a(n)   ?  .

Rack enclosure

500

In most combination circuits, loads such as lights, solenoids, and motors are typically connected in   ?  .

Parallel

500

 ?   instructions shift data one bit at a time to earlier or later locations within a PLC program and are entered as “bit shift left,” “bit shift right,” and “copy function.”

File

500

An example of a(n)   ?   circuit is a dimmer switch used to control a lamp.

analog

500

A separate reset (RES) instruction is required to reset a(n)   ?   instruction.

RTO

M
e
n
u