Estimating
Cost
AIM
Project Controls
Scotford
100

This is the amount of people in our estimating department

What is 10?  (3 TA Estimators and 7 Project Estimators)

100

EAC stands for?

Estimate At Complete

100
  1. What does EDR stand for?

Engineering Drafting Request

100
  1. What Does IPA stand for?

    1. Independent Project Analysis
100

The amount of Process Units within Scotford?

How many is 8?

200

This is the Estimating Mechanical Tool name

What is Aspentech?

200

VOWD stands for?

Value of Work Done

200

When you search in the AIM system how do you differentiate between the refinery and chemicals plant?

“Refinery” uses “underscore” in the doc number and “Chemicals” uses “periods”

200
  1. One of the following is NOT part of our Project Controls team at Scotford 
    1. Estimating
    2. AIM
    3. Cost
    4. Benchmarking
  • Benchmarking
200

The name of the area where you go when the fire alarm is activated onsite

What is a muster point?

300

What does CSU stand for?

Commissioning and Start-Up

300

How do you calculate CPI?

EV / AC (Earned hours / Actual hours – also acceptable answer)

300

The Aim Department falls under what AMS Process?

2.3.1. MIDS – Manage Information Data & Systems

300
  1. Where is Scotford Project Controls TAO based out of? 
    1. Bangalore
    2. Chennai
    3. Mumbai
    4. Delhi
  • Chennai
300

The name of the event when people bring and showcase their cars?

What is "Show and Shine"

400

The definition of "ROM"

What is a Rough Order of Magnitude


400

How do you know if the work order or network will be able to accept the purchase req creation?

Status needs to show “REL” (released)

400

What is the deadline for NRD on email?

March 31, 2021

400
  1. One of these options includes Project Controls Team members that play/played in a band 
    1. Raymond, Brandon, Kevin, Marty, Bobby
    2. Oscar, Johnny, Kevin, Marty, Bobby
    3. Melissa, Mingkai, Kevin, Marty, Bobby
    4. Angela, Rodelle, Kevin, Marty, Bobby
    5. Raymond, Ronald, Kevin, Marty, Bobby
  • Raymond, Brandon, Kevin, Marty, Bobby
400

The definition of "BRM" which are the small steel buildings onsite

What is a blast resistant module?

500

The definition of "TIC"

What is Total Installed Cost

500

– On Track – Allocation Status 0/1/2 meaning (answer 2 or more to get the question right);

0 – Allocated, 1 – Accepted, 2 - Authorized

500

What is the main 3D design tools we are using @ Scotford?


  1. PDS

  2. S3D

500
  1. What are the Project Control Functions that TAO Support?
    1. Benchmarking, Estimating, Cost Control
    2. As-Built, EDR, Estimating, Scheduling, Cost Control, Req Tech, Document Control
    3. Cost Control, EDR, Engineering, Document Control
    4. Planning, Rec Tech, Procurement, Inspection, Environmental
  • As-Built, EDR, Estimating, Scheduling, Cost Control, Req Tech, Document Control
500

The number of the PLEX building where we have our site orientations

What is a 52 Plex?