Proposal Creation
NetSuite
IQ
Receiving
Manf. Communication
100

The program we use to price out product.

Spec (ProjectSpec)

100

How to get product lines into NS.

Drag and drop the SIF file into the proposal while in edit mode.

100

The first step to creating a quote request in IQ.

Click "Orders". Click "New". 

100

How to tell if items have been received in NS.

The status at the top of a PO. On the individual line items.

100

This is what COM means.

Customer Own Material

200

A website to use when you cannot remember how to do something in Spec.

DesignPop
200

These are the steps to invoicing/closing out a sales order in NetSuite.

1. Double check customer doc matches sell amount. 

2. Make sure all needed docs are attached to SO.

3. Create task, assign to Pauline/Valerie, include needed information.

200

What to write in the "Order #" spot.

An identifying project name, nothing too long.

200

How to receive a PO in NetSuite.

Go to PO. Click "receive" at the top. Apply lines to a bin. Click "save".

200

A way to send samples.

Material Bank. Contact rep. Go to manufacturer website. Check our library.

300

5 things an Account Manager should give you when they request a proposal. (there are more than 5)

SIF, Customer, ship/install address, G drive, install quote?, NS Project?, install date, margin

300

This is how to process a Haworth order.

Haworth Integration! (when possible). Get with MG if you have not done this yet.

300

The information you should write in "Summary".

Delivery information (loading doc, NBH, etc). What product we are installing. Any other details Milton needs to know.

300

How to print a BOM acknowledgement in NS.

On a SO, click "select printout". Select "Bill of Materials" from drop down. Click "submit". It will be under the communications tab, under "files". Or it pops up in another browser tab.

300

The reason we would reserve fabric prior to order entry.

Large project. Make sure dye lots are the same. Confirm we have stock available.

400

How you price out multiple lines at once in Spec.

Go to "Price", "General Discounts". Fill out dealer and customer discounts. Hit "Apply".

400

How vendors end up in NetSuite.

Valerie is sent customer docs (W9, customer form, COI, subcontractor agreement). She adds them to NS.

400

These are documents you should attach to an IQ proposal.

Floor plan, BOM, relevant product information, renderings. 

400

This is what to do with a receiving document.

Verify what product was received. Attach to NS PO. Receive items in NS. Save receiving report with important identifying info. Update spreadsheet.

400

3 things you need to tell the manufacturer when requesting a product quote. (there are more than 3)

Product #, description, Quantity, Finishes (grade), Ship to address (zip code), Deadline for quote, Customer name, location

500

How you add non-inventory items to the SIF/PMX file.

Go to "custom" on the left side and drag & drop the right item in.

500

These are 3 things you need to fill out in NS when creating a proposal (out of many).

Customer, project #, Install date, AM/PC, Internal memo info, deposit %, drag SIF, ship to/install address, sales team tab, double check lines, check bill to, add quotes. 

500

This status is what you should save you IQ proposal in so it sends an email to Milton.

Quote Ready for Review

500
The way to export an excel of your sales order.
Search "SO Export for DT - jaw update" in NS. "Return to Criteria". Change document number to your SO number. Click "set" then "submit". Click the excel icon and go grab it from downloads. 
500

The amount yardage needed for the following:

Maharam Arabesque, Marine and Turquoise (Repeat: 2 3/4" V, 1" H)

Product: Kimball Geo Chair, QTY 4

[Solid: 2.5] [1-4" Repeat: 3.4] [5-11" Repeat: 4.2] [12-18" Repeat: 6.7]

3.4 yrds x 4 = 13.6 - round up to 14 yards

M
e
n
u