Financial Management
Document Control
Scheduling
Quality
Random
100

A project estimate predicts costs before the project starts, this financial management tool is the approved cost plan used to track and manage expenses during the project.

What is a budget?

100

A software that manages construction projects from preconstruction to closeout. Also, drawing revisions are captured here.

What is Procore?

100

In addition to an activity list and Gannt chart, you might find this in a scheduling PDF.  

What is a Work Breakdown Structure (WBS)?

100

These contract documents provide detailed written requirements for materials, workmanship, and quality, while drawings visually show the design and dimensions.

 

What are specifications?

100

After moving to Jacksonville, fresh from earning a bachelor's degree in civil engineering from Princeton and a BA from Harvard, Preston Haskell founded the Haskell Company in this year.

What is 1965?

200

In construction project management, this includes regularly predicting the final cost of the project based on current spending and future projections.

What is forecasting?

200

To ensure that materials and equipment installed conform to the design intent in the construction document, these are reviewed thoroughly and managed carefully.

What are submittals?

200

A project scheduling method used in construction to identify the longest sequence of dependent activities and determine the shortest possible project duration.  

What is the Critical Path Method?

200

A scorecard with three components: QIP, Internal Leadership Ratings, and Client Ratings (Net Promoter Score).

What is QPR?

200

Before joining Haskell, Sam had this job in the Navy.

What is flying helicopters?

300

This document is issued when there is a modification in the project scope, design, or schedule, requiring an adjustment to the project cost or timeline.

What is a change order?

300

Besides drawings, meeting minutes, submittals, and contracts, the document control team also has policies on these, which clarify or confirm contract document interpretations.

What are RFIs?

300

A scheduling software most commonly used in the construction industry to manage project timelines, resources, and critical paths.

What is Primavera P6?

300

Our Quality Performance Rating lets us know how well Haskell projects are meeting quality expectations, leadership goals, and client experience. The Net Promotor Score of the client experience represents this percentage of our overall score.  

What is 50%

300

Stacey is not a fan of late arrivals; she prefers this method of consequence for tardiness.

What is forcing them to demonstrate the moonwalk?

400

When a project team member is booking a cost against a project, three designations are required to book the cost: job number, cost, code, and this.  

What is cost type?

400

This document is completed by a designated person to capture participants, important agenda items, record decisions and update action items.

What are meeting minutes?

400

This term refers to the point in a project when a specific, important activity must be completed to keep the project on track.

What is a milestone?

400

During the construction phase, this activity is when a project team member verifies the installation of a scope of work that is only 5% complete is in compliance with the contract documents before the installation continues and is completed.  

What is a First Work in Place Inspection (FWIP)?

400

Haskell delivers AEC solution to capital projects worldwide. Haskell clients benefit from decades of experience and history or delivering exemplary solutions in over 16 market. The DB method of the Jacksonville Jaguars practice facility is an example of a large project from this market.

What is municipal?

500

An example of this prime contract type: In Procore, you review a prime contract that shows that a contractor is reimbursed for direct and indirect costs and is paid a fee for services rendered. That fee is stated as a stipulated sum or percentage of cost.

What is Cost Plus?

500

Email correspondence is a common way to communicate about project work. This is a tool to collect, save, and maintain all project related emails.  

What is the project's Outlook E-mail Group?

500

When project scope increases, these are two items that must be reviewed and considered before proceeding. 

 

What are time or cost impacts?

500

This piece of equipment is used to check large roof areas for leaks during or after an installation?

What is Detec IntegriScan (or Detec)?

500

Some like ballet, some enjoy salsa, but this is Preston "Precon" Robinson's preferred style of dance.

What is break dancing?

M
e
n
u