100

Smaller is better in these two benefits selection methods

Opportunity cost and pay back period

100

The input for the process Perform Integrated Change Control

Change requests

100

The process where you create a summary of the RTM. 

Define Scope

100

A timed box meeting where three things are discussed by each team member every day.

Daily standup meeting

100

On a project with 13 people, you have this many communication channels.

78
200

The scope of work is very poorly defined. I better put into play, this type of contract

Time and Material contract

200

The team is doing an inspection during Control Quality to check for correctness. Well you better have this input in order to perform this.

Deliverables

200

A business analyst assists with building a business case and this type of study

Feasibility Study

200

On an agile project, the executive director tells you he wants you to focus primarily on processes and tools to manage the project. Instead, you recommend to him that focusing on this is favored in an agile environment

Individuals and interactions

200

You are using this communication method if you post a report to a website that for your team members to log in and read

Pull communication

300

Need to figure out how much a risk will impact in cost or time? Well do this process and you will know.

Perform Quantitative Risk Analysis

300

You would need this document that looks at benefit measurement methods to select a project before you can develop the project charter

Business Documents/Business Case

300

You are in this process when you are performing a variance analysis between the budget and how much you have actually spent to date

Control costs

300

A stakeholder walks into your team room and is asking what work the team is doing right now. What artifact/radiator would you direct him to?

Iteration backlog/ Kanban Board

300

Looking at the desired levels of engagement of each stakeholder you have categories such as unaware, neutral, leading and these other two.

Resistant and supportive

400

An estimation technique that can make use of either triangular distribution or beta distribution when estimating for cost or time

Three point estimating

400

You are at the point where a lot of project information is well known and the project sponsor expects to receive a narrow estimate for the entire cost of the project. You wouldn't give him a rough order of magnitude or preliminary estimate. This type of estimate, is best.

Definitive (-5% to +10%)

Preliminary (-20% to +30%)

ROM (-25% to +75%)

400

This process is about creating a plan for each risk by determining actions to enhance opportunities and reduce threats

Plan Risk Response

400

The development team demonstrates the working features to the product owner and stakeholders they have completed during the current sprint in this ceremony.

Iteration Review

400

You are in the war room in an agile project and you get useful information about a requirement while overhearing other colleagues talk. This is known as.... 

Osmotic communication

500

You are performing earned value management and determine that you have a CPI of 1.2. What does this tell you?

That we are under spending/under budget

500

Woo hoo, almost to the finish line as we are going into close project or phase. Bring this input on in though or there will be no celebrating.

Accepted deliverables

500

The tool that is used to determine how the seller of an RFP is going to get selected

Source selection analysis

500

A product owner has requested a meeting to negotiate on a contract. You go into the meeting with this mindset instead.

Customer collaboration

500

There are this many categories in the theory that states that lower level needs need to be met before a person can be motivated by higher needs

Five: Self-actualization, Esteem, Acceptance, Security, Physiological