The Subdivision of Project Deliverables 

What is Decomposition? 


100

The Process of Comparing the Actual Deliverables Against What Was Documented Within the Scope Baseline

What is Verify Scope? 

100

A Type of Project Schedule That Focuses on Iterative Work and Frequent Updates to the Project Plan

What is Rolling Wave Planning? 

100

The Process of Identifying and Documenting Relations Among the Project Activities

What is Sequence Activities?

100

A Graphical Tool Used for Scheduling Activities in a Project Plan

What is Precedence Diagram Method? 

200

Visual and Deliverable-Oriented Deconstruction of a Project

What is Work Breakdown Structure?

200

Measuring, Examining and Verifying to Determine whether Work and Deliverables Meet Requirements and Product Acceptance Criteria

What is Inspection? 

200

A Management Tool That is Used to Delineate a Point in a Project Schedule 

What is Project Milestone? 

200

A Technique That Helps Determine the Overall Cost and Timeline of a Project.

What is Bottom-Up Processing? 

200

A Graphical Representation of a Schedule Showing Each Sequenced Activity and the Time it Takes to Finish Each one  


What is Schedule Network Analysis? 

300

Document Generated by the Create WBS Process that Supports the WBS

What is WBS Dictionary? 

300

Deliverables that Meet the Acceptance Criteria are Formally Signed Off and Approved by the Customer or Sponsor

What is Accepted Deliverables? 

300

A Planning Tool Used in Project Management to Get an Overview of the Entire Project or a Virtual Timeline 

What is Gantt Chart? 

300

Uses Information From Similar Projects to Establish a Cost Estimate based on the Data Available  

What is Analogous Estimating? 

300

A Technique Where you Identify Tasks That are Nessecayr for Project Completion and Determine Scheduling Flexibilities

What is the Critical Path Method? 

400

The Approved Version of a Scope Statement and WBS 

What is Scope Baseline? 

400

The Process of Monitoring the Status of the Project and Product Scope and Managing Changes to the Scope Baseline

What is Control Scope? 

400

A Graphical Tool Used for Scheduling Activities in a Project Plan

What is Precedence Diagramming Method? 

400

A Statistical and Accuracy-Based Technique for Calculating the Time, cost, and Resources Needed for Project Success  

What is Parametric Estimating? 

400

Used to Preform Schedule Network Analysis That Considers Task Dependencies, Limited Resource Availability, and Buffers 

What is the Critical Chain Method? 

500
Something Outside the Project That Impacts Something Internal to the Project

What is External Project Dependency?

500

A Required Delay at the Start of the Successor Activity 

What is Project Lag? 

500

A Non-Negotiable Requirement

What is Mandatory Project Dependency 

500

Analysis of Existing Resources to Provide TRansparency Into Campus' Reserve Balances and Allow us to Better Frame how we can Enable Their use for Investment in our Highest Priorities 

What is Reserve Analysis?
500

The Process of Estimating the Expected Value of a Portfolio After a Given Period of Time 

What is What-If Scenario Analysis? 