Required/Related References
Funding
POC & The Project Officer
Planning
Equipment/Moving
100

This Form is used for the "Facilities Engineering Work Request"

DA Form 4283

100

This fund is used for a new building project

MILCON funds

100

List 1 of the 3 "Higher-level" points of contact

1 - Design Agent.

2 - Regional Facility Director

3 - The SRM Guide

100

The planning that begins with the "move in" date as the final milestone is known as

Backward Planning

100

This form is used to transfer an ECN item off of the Hand Receipt 

DA 3161

200

This AR covers "Army Facilities Management", has 483 pages and can help with "Master Planning"

AR 420-1

200

this fund is used the renovation or reconstruction of an existing building

O&M

200

List 2 of the 5 "Primary" points of contact

1 - Medical Activity Facility manager

2 - Contractor

3 - radiation protection officer, information management office etc.

4 - Garrison points of contact

5 - Medical Maintenance 

200

Name 1 of the 2 "time" related planning steps and 1 was stated to be optional

1 - Identify time lines involved

2- Formulate a personalized backward plan or time line, optional

200

What are 3 of the 5 Dental laboratory considerations regarding equipment 

1 - Ventilation hoods

2 - Natural gas

3 - Compressed air

4 - Specialized equipment

5 - Plumbing

300

This program guide will provide you with you need to know regarding the Planning of New Dental Facilities, to include the MIL-STD-1691 Military Medical and Dental Facilities publication.

SRM Program Guide UFC 4-510-1

300

How many project funds limits are there

4

300

The NCO should coordinate through this office before directly contacting the contractor

Project Office

300

This diagram is important when it comes to construction of a new or existing dental clinic

Floor Plan

300

What Form is used to transfer existing equipment off of the Hand Reciept

DA Form 3161

400

The AR covers the "Army Modification Program" and is 36 pages long. 

AR 750-10

400

What is the lowest project fund limit

< $25,000

400

The name of the 2 "sheet(s)" needed in order to assist the project officer with procurement of all new equipment and furniture

1 - Data Sheets

2 - Cut Sheets

400

Who is responsible for demonstrating how to leverage certain design modifications based upon projected clinic business practices 

NCOIC

400

What are 2 things that must be managed when moving from one clinic to another

1 - Manage movement of staff

2 - Manage movement of property and equipment

3 - Ensure all agencies are informed to include contractors, union representatives, ect. 

4 - Manage staff training on any and all new equipment

500

What does (SRM) stand for in, SRM Program Guide UFC 4-510-01

Supplier Relationship Management

500

What is the largest project fund limit

>$750,000

500

This report will help to identify pre-existing equipment that could be used and will provide Maint. Cost(s) remaining on specific equipment

Equipment Replacement Report

500

Name 3 of the 4 clinic business practices one would need design modifications based upon

1 - First term dental readiness

2 - Dental clinic optimization

3 - Centralized sterilization

4 - Information management (IM) Information technology (IT)

500

What is the last thing to be completed after the move but prior to start of business

Ensure equipment and systems are functioning properly at the portable buildings(trailers) o rat the new or modernized facility as applicable. 