The office sits directly above the Council Chambers.
Engineering Division
This Famous American has held every engineering position within the City except for one.
Andrea Renny
Public Works Director
This Division was formed in 1966 in order to provide and manage spaces for vehicles throughout the City.
The Parking Division
A constructed feature that typically collects and temporarily stores stormwater runoff.
Detention Ponds
Before
After
Public Works Truck
This Division's Office is located off of Tyler Street.
Parking Division
Born and raised here on the Peninsula and has never left. This Division Head has been with the City for 23 years.
Jeff Glass
Streets and Utilities Operations Manager
This Division assists many City employees to perform their daily job tasks by providing alternatives to walking.
Fleet Division
The City of Monterey has secured $1 million from the State for an urban diversion project to send water from this body to the Monterey One Water’s Regional Treatment Plant and assist regional water reuse efforts.
Lake El Estero
Before
After
Colton Hall ADA Improvements
This division’s office is adjacent the City’s newest large scale parking lot.
Harbor Office
This Division Head is listed in IMDB for his appearance in the 1980's film The Vals.
Thom Levendowski
Deputy Public Works Director/Administration
This division provides access to a variety of recreational and commercial opportunities for residents and visitors alike in a scenic setting, and continues to improve services and infrastructure, allowing for even greater access to the area for fishing or leisure purposes.
Harbor Division
A City system comprised of approximately 102 miles of pipes, 7 lift stations, and over 2,000 structures.
Sanitary Sewer Utility System
Before
After
Public Works Backhoe
This location has spectacular views of going up, up, up, and away!
Fleet Division Building at Ryan Ranch
(in view of the MRY daily air flights)
This former Arizonian was once self-employed and a certified fire fighter.
Rex Van Slyke
(Fleet Manager)
The mission of this Division is to design, construct, operate, and maintain public infrastructure.
Engineering Division
This stream runs behind the library and is a mitigation site for the City's Storm Drain Maintenance Plan.
Hartnell Gulch
Before
After
Crosswalk and Ramps at Sloat Ave & 5th St
This office has a nickname which sounds like a place Alice might like to visit for tea.
The Mad House
(Madison House, PW Admin)
This division head has been bitten by sea otters of all ages (in a volunteer and intern capacity).
Nichole Rodriguez
These 2 Divisions keeps your toilets flushing.
General Services and Streets Division
Areas of New Monterey that require Special Protections to reduce pollution discharge into this designated area.
Areas of Special Biological Significance (ASBS)
Before
After
Vets Park Parking Lot ADA Improvements