Safety
Commissioning
Administrative
Construction
Materials
SOLV Systems
Budget & Cost
Spot the Issue
Misc.
Final Jeopardy
100

What does LOTO stand for?

Lock Out Tag Out

100

The testing and verification of systems in a facility before introducing actual process materials, power, or live operational conditions.

Cold Commissioning

100

A construction project milestone that signifies all mechanical systems, equipment, and components have been installed, tested, and are ready for pre-commissioning, commissioning, and startup according to design specifications and project requirements.

Mechanical Completion

100

The initial planning phase of a construction project that happens before any physical building begins.

Pre-Construction

100

A perforated pipe installed underground to collect and divert excess water from soil or a building's foundation, preventing water from accumulating and causing damage.

Drain Tile

100

Where can you download Sunscreen?

Use a link to Sunscreen's webpage

100

A business or person that carries out work for a company as part of a larger project.

Subcontractor 

100

What's wrong here?


Standing under a suspended load

100

What is our greatest resource at SOLV

THE PEOPLE!

100

Calculate the rock needed for a road

100' length

20' width

8" depth

1.5 Tons of rock/cubic yard

69.48 - 73 Tons 

(depending where you round)

200

When does your OSHA 30 training expire?

OSHA 30-Hour certification does not legally expire, but individual employers, states, or cities may require refresher training every few years (typically 3-5)

200

This test uses an insulation tester and applies a high DC voltage to electrical equipment to measure the resistance between its conductors and ground.

Megger

200

A formal, written amendment to an existing contract that documents and approves modifications to the original scope of work, project timeline, or budget.

Change Order

200

What is this?


160k Motor Grader

200

What is this?


RTAC

Real Time Automation Controller

200

Where can you download Bluebeam for your company laptop?

Company Portal

200

Give the folder name or number where subcontracts and purchase agreements are stored on Sharepoint.

29. Commitments

200

What's wrong here?


In equipment blind spot

200

When capturing meeting minutes, what is the most important thing?

Accuracy 

300

What class of electrical gloves should you be using to safety work around the stringwire?

Class 0 - rated for 1500v DC

300

A phase of plant or system startup where the actual "live" power is introduced to perform tests under real operational conditions, confirming the system's ability to function safely and efficiently as designed. It

Hot Commissioning

300

A detailed document or set of requirements that outline the technical details of a product or system, covering aspects like materials, design, software, hardware, performance, and functionality.

Tech Specs

300

A key electrical system facility that transforms voltage levels, switches circuits, and distributes power from generators to end-users.

Substation

300

What is this?


MPT

Medium Power Transformer

300

What folder number is progress photos in The Grid?

24

300

All subs and vendors onsite need to be ___ a ___?

Under a contract

300

Name 3 items missing from this fuel station needed to be in compliance


Spill kit, drip pan, fire extinguisher, eye wash, & secondary containment

300

What is the first thing we need to do when receiving a submittal?

Review the document 

400

An unplanned event or situation with the potential to cause injury, illness, or damage, but which ultimately does not, often due to a slight change in circumstances, such as luck or quick action.

Near Miss

400

This test is a common method for measuring the ground resistance of an electrical grounding system by injecting a known current into the soil and measuring the potential drop at different points to determine the overall resistance.

FOP

Fall of Potential

400

Is an approved, fixed project timeline that serves as a reference point to measure progress and track performance.

Baseline Schedule

400

This study assesses how a site's water systems, including surface water, groundwater, and precipitation, will interact with a proposed project

Hydrology Study

400

A legal document issued by a carrier to acknowledge receipt of cargo for shipment, acting as a receipt for the goods, a contract between the shipper and carrier, and a document of title.

BOL

Bill of Lading

400

You/Employee need permission changes to Sunscreen, who do you go to?

Project Manager will put a ticket in to tech support

400

A written amendment that modifies the terms of an existing contract, most commonly in construction, to document changes in the project's scope, cost, or schedule

Change Order

400

Spot the OSHA violation



Spoils are within 2 ft of trench

400

Occurs once a month for everyone in the company to hear updates

Source Call

500

A safety standard for electrical safety in the workplace to protect workers from major electrical hazards such as shock, electrocution, arc flash, and arc blast.

NFPA 70e

500

This test measures the voltage of a power source, like a battery or solar panel, when no electrical load is connected, using a digital multimeter set to DC voltage.

VOC

Voltage Open Circuit

500

This is the sequence of project tasks that determines the minimum project completion time. Any delay to a task on these scopes directly delays the entire project.

Critical Path

500

This test determines the load-carrying capacity and integrity of deep foundation piles by applying loads and measuring their response, typically using hydraulic jacks and displacement sensors.

Pile Load Testing

500

Fiber optic cables are primarily made of two materials for their core, name one.

ultra-pure glass (silica) or plastic (polymers like PMMA)

500

How do you get admin access to download/update programs

Requested through the service portal (they won't approve programs they have not vetted)

500

A model where a construction company uses its own skilled labor and teams to complete specific scopes of work on a project, rather than subcontracting those tasks out.

Self Perform Work

500

What's the SWPPP violation?


Silt fence is not filtering water, dirty water flowing offsite

500

These are the 3 C's with servant leadership

Compassion

Character

Competence

600

What type of fire extinguisher should you use on an electrical fire

Class C

600

AC voltage test used to assess the insulation quality of medium and high voltage power cables and other high-capacitive equipment, such as rotating machinery. The test involves applying a low-frequency (typically 0.01–0.1 Hz) AC voltage to the cable, which is much higher than the normal operating voltage, to stress the insulation and reveal weak points or damage that could lead to in-service failure.

VLF

Very Low Frequency

600

A construction term meaning a project is sufficiently finished that the owner can begin using it for its intended purpose, even if minor work or a punch list of corrections remains.

Substantial Completion

600

A specific, target date within a contract when a project, like a power plant or construction facility, is expected to be fully operational and ready to generate revenue or deliver its intended service, having successfully passed all necessary testing and certification.

COD 

Commercial Operating Deadline

600

A passive electronic or RF (radio frequency) device used during installation of underground cable to mark key locations and prevent accidental damage by excavators later on

Marker Ball

600

How many progress photos do the SOLV guidelines suggest to take per day?

50 per day

600

The pre-agreed hourly costs for labor and the direct costs for materials, plus a markup that a contractor charges a client for a project.

T&M Rates

600

Which MET station sensor has an issue?

Temp sensors (TBOMs)

600

This form of communication makes up for 55% of total communication

Body Language

700

This section of the PTP helps workers systematically identify hidden or less obvious hazards at a job site by prompting them to consider various forms of energy

The Energy Wheel

700

The flux of radiant energy per unit area (normal to the direction of flow of radiant energy through a medium). The SI unit of this is the watt per square metre.

Irradiance

700

A federally required document under the EPA's Oil Pollution Prevention regulation that details how a facility prevents, controls, and responds to oil discharges from reaching navigable waters or adjoining shorelines.

SPCC

700

This survey is a detailed, three-dimensional map of a property that identifies and measures all natural and man-made features, showing elevation changes and creating a 3D picture of the land for architects, engineers, and contractors. In construction

Topographic Survey

700

How cold is too cold to pull wire?

About 14 degrees Fahrenheit 

700

A foreman asks a PE to order more material. What should be the PE's response?

Did you talk to your superintendent about this?

700

This is an event or factor that threatens a company's ability to achieve its objectives, potentially leading to financial losses, a damaged reputation, or even business failure.

Risk

700

This is an example of


Galvanic Corrosion

700

What are the two things that can be impacted anytime there is a change?

Schedule and Cost

800

A visual, color-coded grid used in risk management to prioritize risks by plotting them based on their likelihood of occurrence and the severity of their potential impact.

Risk Assessment Matrix

800

 This occurs in a solar energy system when the solar panels (photovoltaic or PV array) generate more DC power than the installed inverter can convert to AC power, resulting in some energy loss and a flattened "peak" on the power production curve.

Clipping

800

An NPDES permit that sets the rules for controlling stormwater pollution from construction sites that disturb one or more acres of land, or are part of a larger common plan of development. The permit requires operators to develop a Stormwater Pollution Prevention Plan (SWPPP), implement control measures, and conduct site inspections to prevent pollutants like sediment from entering waterways.

CGP
Contruction General Permit

800

This document outlines the acceptable testing specifications for electrical power equipment and systems. This standard defines field tests and inspections for evaluating new equipment before initial energization

ANSI/NETA ATS

Acceptance Testing Specifications

800

Corrosion of dissimilar metals occurs when two different metals are in electrical contact within an electrolyte, such as water. One metal, the anode, becomes sacrificial, losing mass (corroding), while the other, the cathode, is protected.

Galvanic Corrosion

800

Where do you update your time off/POD week for the Midwest team to see?

Midwest Smartsheet Page?


800

A specific, pre-agreed amount of money paid for a contract breach, typically when actual damages are difficult to measure. They function as a reasonable estimate of potential losses, not a penalty, and are established in a contract clause before the breach occurs.

Liquidated damages

800

Spot the issue


Safety glasses are Ray Bans

800

What's the S.M.A.R.T. goal acronym 

Specific, Measurable, Achievable, Relevant, and Time-bound.