Safety
Commissioning
Administrative
Construction
Budget & Cost
100

What does LOTO stand for?

Lock Out Tag Out

100

The testing and verification of systems in a facility before introducing actual process materials, power, or live operational conditions.

Cold Commissioning

100

A construction project milestone that signifies all mechanical systems, equipment, and components have been installed, tested, and are ready for pre-commissioning, commissioning, and startup according to design specifications and project requirements.

Mechanical Completion

100

A perforated pipe installed underground to collect and divert excess water from soil or a building's foundation, preventing water from accumulating and causing damage.

Drain Tile

100

The pre-agreed hourly costs for labor and the direct costs for materials, plus a markup that a contractor charges a client for a project.

T&M Rates

200

How often are fire extinguishers checked onsite?

Monthly

200

Fiber optic cables are primarily made of two materials for their core, name one.

ultra-pure glass (silica) or plastic (polymers like PMMA)

200

A formal, written amendment to an existing contract that documents and approves modifications to the original scope of work, project timeline, or budget.

Change Order

200

The initial planning phase of a construction project that happens before any physical building begins.

Pre-Construction

300

This section of the PTP helps workers systematically identify hidden or less obvious hazards at a job site by prompting them to consider various forms of energy

The Energy Wheel

300

A phase of plant or system startup where the actual "live" power is introduced to perform tests under real operational conditions, confirming the system's ability to function safely and efficiently as designed. It

Hot Commissioning

300

A detailed document or set of requirements that outline the technical details of a product or system, covering aspects like materials, design, software, hardware, performance, and functionality.

Tech Specs

300

A legal document issued by a carrier to acknowledge receipt of cargo for shipment, acting as a receipt for the goods, a contract between the shipper and carrier, and a document of title.

BOL

Bill of Lading

400

What rating is needed for a garment to be concidered "AR" (arc rated)

ATPV or CAT rating

400

A passive electronic or RF (radio frequency) device used during installation of underground cable to mark key locations and prevent accidental damage by excavators later on

Marker Ball

400

Is an approved, fixed project timeline that serves as a reference point to measure progress and track performance.

Baseline Schedule

400

How many progress photos do the SOLV guidelines suggest to take per day?

50 per day

500

This document outlines the acceptable testing specifications for electrical power equipment and systems. This standard defines field tests and inspections for evaluating new equipment before initial energization

ANSI/NETA ATS

Acceptance Testing Specifications

500

The flux of radiant energy per unit area (normal to the direction of flow of radiant energy through a medium). The SI unit of this is the watt per square metre.

Irradiance

500

This is the sequence of project tasks that determines the minimum project completion time. Any delay to a task on these scopes directly delays the entire project.

Critical Path

500

A specific, target date within a contract when a project, like a power plant or construction facility, is expected to be fully operational and ready to generate revenue or deliver its intended service, having successfully passed all necessary testing and certification.

COD 

Commercial Operating Deadline