QCQA BASICS
PROJECT MANAGEMENT
PROJECT MANAGEMENT 2
ERFO BASICS
MORE ERFO
100

THE FULL NAME OF QCQA

WHAT IS QUALITY CONTROL QUALITY ASSURANCE

100

THE FIRST PHASE OF PROJECT DEVELOPMENT

WHAT IS PLANNIN

100
THE THREE ITEMS TO CONTROL WHEN MANAGING A PROJECT

WHAT ARE COST, SCHEDULE, AND SCOPE

100

THE DECLARATION THAT NEEDS TO BE GIVEN BEFORE BEING ELIGIBLE FOR ANY FUNDING.

WHAT IS A PRESIDENTIAL DECLARATION

100

FORM USED TO DOCUMENT DAMAGE WHICH INCLUDES ESTIMATES AND PHOTOS

WHAT IS THE DAMAGE SURVEY REPORT

200

ONE OF THE SIX CORE FUNCTIONS OF QCQA

CONTRACTOR QUALITY CONTROL, QUALITY ASSURANCE, INDEPENDENT ASSURANCE, DISPUTE RESOLUTION,  LAB ACCREDIATION, PERSONNEL QUALIFICATION

200

THE TWO TYPES OF AWARD IN THE PROJECT DEVELOPMENT PROCESS

WHAT ARE PRE-AWARD AND POST AWARD

200

ANOTHER WORD USED FOR THE PROJECT DESCRIPTION

WHAT IS PROJECT SCOPE

200

THE TWO TYPES OF EVENTS THAT MUST HAPPEN TO BE ELIGIBLE FOR ERFO FUNDING

WHAT IS A NATURAL DISASTER AND CATASTROPHIC EVENT

200
THE MINIMUM DOLLAR AMOUNT OF DAMAGE TO BE ELIGIBLE FOR ERFO FUNDING

WHAT IS $700,000

300

THE CORE FUNCTION WHICH "INDEPENDENTLY" TESTS MATERIALS.

INDEPENDENT ASSURANCE

300

THE PERSON WHO IS OFTEN HIRED TO RUN MEETINGS AND KEEP THEM ON TRACK

WHAT IS A FACILITATOR

300

THE PERSON WHO OVERSEES THE PROJECT 

WHO IS THE PROJECT MANAGER

300

"POP" STANDS FOR

WHAT IS PROGRAM OF PROJECTS

300

THE DOLLAR AMOUNT NEEDED TO BE ELIGIBLE FOR ERFO FUNDING FOR TRAILS AND PARKING LOTS

WHAT IS $5000

400

THE SYSTEM DESIGNED TO SOLVE ISSUES BETWEEN THE CONTRACTOR AND THE TRIBE

WHAT IS DISPUTE RESOLUTION

400

THE TWO TYPES OF MEETINGS

WHAT ARE STATUS AND PROGRESS MEETINGS

400

THE TWO WAYS OF ESTIMATING COSTS

WHAT ARE BID BASED AND COST BASED ESTIMATES

400

REPAIRS WHICH ARE MADE IMMEDIATELY AFTER AN EVENT

WHAT ARE EMERGENCY REPAIRS

400

THE FEDERAL ORGANIZATION TRIBES CONTACT TO BEGIN THE ERFO PROCESS

WHAT IS THE BIA

500

LABORATORIES PERFORMING TESTS FOR DISPUTE RESOLUTION NEED TO BE THIS

WHAT IS QUALIFIED

500
THE TRACKING SHEET OR SYSTEM WHICH ASSIGNS RESPONSIBLITY OR "ACTIONS" TO YOU TEAM MEMBERS

WHAT IS A ACTION ITEM CHECKLIST

500

THE PRIMARY OBJECTIVE OF SCHEDULING

COMPLETE PROJECT WITH LEAST COST, RISK AND AMOUNT OF TIME

500

IMPROVEMENTS TO A DAMAGED ROAD OR FACILITY WHICH HAVE TO BE APPROVED BY FHWA

WHAT IS A BETTERMENT

500

THE "KIND" OF REPAIRS TRIBES MUST STRIVE TO MAKE WHEN ESTIMATING COST FOR REPAIRS

WHAT ARE "IN-KIND" REPAIRS