ELECTRICAL
HVAC
FIRE/LIFE
PBB
GENS
100

OUTPUT POWER CAPACITY AT PDU

480/277v to 415/240v

100

Where is superheat measured and why?

Superheating process ensures refrigerant is in a gas state as it exits evaporator

100

NAC PANEL DEFINE AND WHAT IT DOES

Notification Appliance Card Panel

Communication circuit that performs the preset functions of the fire system

100

What is the purpose of the CO2 sensors and where can the ybe found?

Ensures proper ventilation of high occupancy spaces

Found in conference room and other areas with high occupancy

100

8. What is the process of resetting a locked in alarm?

Stop -> Reset -> Auto

200

How MFRs and PLC work together to provide protection to the electrical system in the event of harmful power conditions

MFRs monitor and retrieve data, communicating this information to the PLC. (“hands”)

The PLC then makes automatic decisions based on this data. (“brain”)

200

TES operational modes of a XDM unit. Give a brief overview of reach mode.

Normal mode

Discharge mode

Recharge mode

200

Valves for Pre action

Solenoid valve

Releases priming pressure

Activated during cross-detection

Deluge Valve

Held closed by the priming pressure

Allows water to the sprinkler piping once both conditions are met (cross-detection, loss of air pressure)

Shut-off Valve

Used for testing the system

Water Supply Control Valve

Manually shuts off the pre-action system by preventing water flow

200

Define and describe PBB as it pertains to the site

PBB - Power Base Building

Non-critical spaces (offices, hallways, telecommunication & network rooms)

200

Describe the various modes of operations for the generators on site.

Auto – normal operations

Run – running generator without load transfer

Stop – shuts down after completing cooldown cycle ***Note that in this mode, generator will not run even if PLC commands it to do so

E-Stop – immediately stops the generator from running. ***Note that in this mode,

300

LIST PANELS AND GENERAL LOAD FOR EACH PANEL.

X

300

Setpoints for XDM, and where is the demarcation point?

Return: 96 F

Supply: 77 F


The valves before the customer CDU is the demarcation point.

300

Describe the water flow path through the fire system.

Utility water -> Water Entry Room -> Fire Riser -> Pre-Action Cabinets -> Sprinklers

300

6. Define and describe the function of an EMR, to include location.

Elevator Machine Room

Houses support equipment for elevators

Located on 1st floor

300

11. Define GCB and describe its function.

Generator Control Board

Isolation point for generator input, connection point for load bank.

400

PLC SET POINTS

LC timing set-points

1 sec. – Primary Generator Source Available

2 sec. – Critical Voltage Failure (Utility and Gen)

1 sec. – Undervoltage (Utility and Gen), Open Transition

30 sec. – Generator failed to start

5 minute – Generator cooldown

30 minutes – Utility restoration

400

COMPONENETS OF AN RTU (9)

AIR INTAKE EXHAUST MOTOR EVAP COILS CONDENSOR FANS SUPPLY AIR DUCT HMI CONDENSOR COILS BLOWER RETURN AIR DUCT

400

Explain the different types of fires extinguishers and what type of fires they are used for.

Class A – Ordinary Combustibles

Solids, not metal

Class B – Flammable Liquids or Gases

Grease, tar, alcohols, flammable gas

Class C – Electrical

Energized equipment

Class D – Metal

Magnesium, titanium, sodium

Class K – Cooking Oils

Animal and vegetable oils, fats

400

What components can be found inside of a DLR IDF room? What IDF equipment needs to be maintained?

BMS and Security racks

UPS for that specific room

400

What 3 conditions must be met before the SCR system activates?

Generator must be running

Generator must be carrying at least 40% of the load

SCR Temperature is above 575˚F

500

DRAW A DOUBLE CONVERSION UPS

X

500

iCom- Cooling Unit Statues (6)

UNIT ON – Operating normally without alarms or warnings

WARNING ON / ALARM ON – Warning or alarm present, still in operation

STANDBY – unit is not in operation but ready for it to turn on if needed (typically units are on standby via a rotation)

ALARM STANDBY – unit is not in operation due to a present alarm

DISpLAY OFF – unit is turned off (intentionally from iCOM display)

BACKDRAFT – unit is not in operation but EC fans are operating as a backdraft tamper (allows airflow in one direction and prevents reverse airflow)

500

Describe a Hot Work Permit, to include:

a. Responsible Party

b. Required Information

Operations team – fills out permit, distributes to vendor, and collects upon work completion

c. When they are needed

Name of contractor, date, change request #, location of work, what work is performed, parties involved, signature

before any temporary operation involving open flames or producing heat and/or sparks, such as welding, cutting, brazing, or grinding, can begin

500

FPT set-point


FPT set-points are dependent upon the space itself

500

a. List major 480/277v loads

Jacket water heats, transformer to LV loads