Q MNGMT SYST
PACKAGING
GENERAL OPS
PRODUCTS
TS16949
100

What are the top quality outages at the site

What are 8

100
The requirements for QC checks of particle count and water on Brayco samples:
What is at least total packaging of 50 drums or less - at least three samples (obtain first, middle and last samples of packaging) For total packaging of 50 or more drums - Sample every 15-20 drums. ( allocated through first , middle and last of packaging) Sample every 15-20 drums.
100
The equivalent of an safety conversation for Quality
What is a QOC
100
This colored hose is required when packaging out a hyspin
What is green
100
The following products are identified as PPAP products in our plant
What is t,sxj,scm, endx
200
Our quality policy is ( hint everyone is...)
What is "everyone is a quality leader"
200
The this time frame must be exceeded for the requirement of pulling a break sample as part of the Quality Line sampling process is dependent on
What is 15 min
200
Work instructions can be used on the floor as long as there is this
What is a stamp as the controlled copy
200
These items are required prior to adding a raw material in a blend
What is secondary sign off and ensuring all raw materials are available for the blend
200
TS and ISO Audits occur on a frequency of
What is one year
300
Our Quality Objective include
What are continuous improvement, meet specifications, reduce variation, measure KPIs (take one)
300
The following must be on the packaging card to start packaging
What is QC approval of POF sample, double check of hookups- connections, and double check of labels
300
A raw material is released for use once what has occurred
What is qc approved, labeled, put away
300
This is the weight variance acceptable for a raw material in a blend
What is +/- 3 %
300
The document that is used on plant floor as work instruction to reference if there is a problem
What is the control plan
400
Our q policy and objectives are posted in the following areas
What are time clock, break room, glass display case by qc
400
The requirements for inspecting a drum BEFORE FILLING as part of the fit for use fit for sale process are to
What is inspecting drum internally for rust, inspecting externally for paint running or unevenness, dents to drum
400
Brayco products can be packaged before the final approval of the blend as long as the following documentation has occured
What is the pack cards have been stamped with Quarantine, and the POF has been approved
400
This serves as primary guide for making primary
What is tank dedication schedule
400
There are six key processes in the plant
What are blending, packaging, storage, receiving, storage, Production scheduling
500
Who owns quality management system
What is top management
500
The particle count requirement to START packaging a wind energy product (Xseries)
What is the internal specification or 14/12/09
500
The frequency required to document and check temperature readings during the blending process
What is every 20 min
500
This automotive product is sold in bulk to BMW and covered under a PPAP for TS16949
What is SAF Carbon Mod
500
Calibrators for ts16949 need to be covered under the following ISO clause
What is ISO IEC 17025
M
e
n
u