Document Control
Drawings & ECN's
Purchasing
Material Handling
Bonus
100

What type of document is approved and has revisions for official use?

What is a Controlled Document

100

What does ECN stand for?

What is an Engineering Change Notice?

100

Before sending drawings to a supplier, what list should be checked?

What is the Approved Vendor List?

100

What color bins are JTE parts stored in?

What is a blue bin? 

100

Can manufacturing use an uncontrolled drawing?

What is a BIG NO NO?

200

What label should be placed on an outdated drawing?

What is "OBSOLETE – DO NOT USE"? 

200

Name one type of change that requires an ECN.

What is material, dimension, specification, finish, or drawing note?

200

If a supplier isn't approved, who should you contact?

Who is the Quality Department? 
200

What color bins are TTA parts stored in?

What is a yellow bin?
200

What should you do if you're unsure whether a supplier is approved?

What is check the approved vendor list or ask Quality personnel?

300

What log is used to keep track of engineering drawings and revisions?

What is the Technical Data Log?

300

Who should review a drawing before the Engineering Manager approves it?

What is another engineer?

300

Name the two documents suppliers must provide with every shipment.

What is the Certificate of Conformance and Material Certificates?

300

What containers should engineers use while working?

What is a clear bin? 

300

Name two reasons document control is important.


What is: Revision Control

Traceability

Compliance

Prevents obsolete drawings

400

What document tracks Engineering Change Notices?

What is the ECN Log?

400

What five characteristics may require FAA approval if changed?

What is form, fit, function, weight, airworthiness?

400

Can Intellectual Property be shared before the supplier is approved?

What is a BIG NO NO?

400

What document follows material throughout receiving, inspection, storage, and release?

What is a receiving traveler?

400

True or False:

Old drawing revisions may remain on the shop floor if marked obsolete.

What is FALSE?

500

Name the three requirements every controlled document must have before release.

What is review, approval, and revision control? 

500

Name four things checked during a peer review.


Dimensions

Materials

GD&T

Specifications

Drawing Notes

Tolerance

Revision

500

What four things must suppliers notify JTE about if they change?

What is certification, ownership, process, and key personnel?

500

What is the purpose of the Receiving Traveler?

What is traceability?

500

What is the purpose of an Inspection Method Sheet? 

To provide instructions for any difficult inspection dimensions