What type of document is approved and has revisions for official use?
What is a Controlled Document
What does ECN stand for?
What is an Engineering Change Notice?
Before sending drawings to a supplier, what list should be checked?
What is the Approved Vendor List?
What color bins are JTE parts stored in?
What is a blue bin?
Can manufacturing use an uncontrolled drawing?
What is a BIG NO NO?
What label should be placed on an outdated drawing?
What is "OBSOLETE – DO NOT USE"?
Name one type of change that requires an ECN.
What is material, dimension, specification, finish, or drawing note?
If a supplier isn't approved, who should you contact?
What color bins are TTA parts stored in?
What should you do if you're unsure whether a supplier is approved?
What is check the approved vendor list or ask Quality personnel?
What log is used to keep track of engineering drawings and revisions?
What is the Technical Data Log?
Who should review a drawing before the Engineering Manager approves it?
What is another engineer?
Name the two documents suppliers must provide with every shipment.
What is the Certificate of Conformance and Material Certificates?
What containers should engineers use while working?
What is a clear bin?
Name two reasons document control is important.
What is: Revision Control
Traceability
Compliance
Prevents obsolete drawings
What document tracks Engineering Change Notices?
What is the ECN Log?
What five characteristics may require FAA approval if changed?
What is form, fit, function, weight, airworthiness?
Can Intellectual Property be shared before the supplier is approved?
What is a BIG NO NO?
What document follows material throughout receiving, inspection, storage, and release?
What is a receiving traveler?
True or False:
Old drawing revisions may remain on the shop floor if marked obsolete.
What is FALSE?
Name the three requirements every controlled document must have before release.
What is review, approval, and revision control?
Name four things checked during a peer review.
Dimensions
Materials
GD&T
Specifications
Drawing Notes
Tolerance
Revision
What four things must suppliers notify JTE about if they change?
What is certification, ownership, process, and key personnel?
What is the purpose of the Receiving Traveler?
What is traceability?
What is the purpose of an Inspection Method Sheet?
To provide instructions for any difficult inspection dimensions