Storage
Application
Site Preparation
Installation
More installation
100

Ramming mixes are packaged in ________

What are POLYETHYLENE BAGS?

100

Ramming mixes are used to install ________

What are  EXTREMELY DENSE LININGS?

100

Ramming mixes should only be opened __________

What is DIRECTLY BEFORE USING?

100

When installing vertical walls--Ramming mix should be 

What is SHOVELED BEHIND THE FORMS?

100

Roughening ensures ________between layers.

What is COHESION?

200

Ramming mixes should be stored in ______

What are DRY STORAGE AREAS?

200

Ramming mixes are usually _______

What is NON-WETTING?

200

All formwork should be constructed and secured according to  __ when installing.

What are JOB SPECIFICATIONS?

200
  • The rammer should be held _______


What is VERTICALLY and at a RIGHT ANGLE to the top surface?

200

Roughening reduces the likelihood of ____

What is LAMINATION?

300

Ramming mixes should be maintained at ____ temperature.

What is ROOM Temperature?

300

Ramming mixes offer strong resistance to ______

What is ABRASION AND CORROSION??

300

Sturdy wooden forms are required for ____

What are VERTICAL WALLS?

300

The mix should be compacted to a depth of at least

What is 2–3 inches?

300

For metal holding furnaces, the ramming mix: Rammed at a ____ angle to half that depth

What is a 90 degree angle?

400

Ramming mixes are made of _____________

What are GRAINY PARTICLES of REFRACTORY MATERIAL

400

Ramming mixes can withstand _______

What is A LOT OF ABUSE?

400
  • Bulkheads should be secured at ____for large floor areas

What are 3 Foot Intervals?

400

Before the next layer is installed the top surface of each rammed layer should be ______

What is ROUGHENED WITH A RAKE OR CHIPPING HAMMER?

400

For heating surfaces, the ramming mix is held at a ___ angle to the working surface.

What is 45 degree angle?

500

The Refractory material in Ramming Mixes is similar to that of _______

What are RAMMING PLASTICS?

500

Ramming mixes contain __________ than ramming plastics

What is LESS MOISTURE?

500

Ramming mixes should be installed without ___

What is WITHOUT INTERRUPTION?

500

Roughening should reach a depth of ___ inches

What is 3/4 inch?

500

Once ramming is complete, the refractory is ___ and vented with ____

WHat is TRIMMED and vented with a 3/16 diameter rod. 