This method, also known as the quadratic mean, is a way to calculate the difference between observed and predicted values
What is Root Mean Square (RMS)
This visual tool illustrates the start and finish dates of various tasks in a project
What is a Gantt chart
This mod level refers to a carry-over part that requires no changes to design or software, but minimal integration rework
What is I1, or Identical 1
This database is the location where Manufacturing Requirements (MRs) can be found
What is Auros
This 1970s "crunch" prompted GM to innovate and develop more fuel-efficient vehicles
What is the OPEC oil crisis
This is the method for controlling the center of a feature of size
What is the true position
This "fixture" is used during Matching event to confirm exterior part fitment
What is ETAC (exterior total assembly checker)
This is the process for preventing carryover systems from being changed without leadership approval
What is the BOM lock process (Also accepted: IBR/FBR process)
This detection level is required by the PFMEA for any severity 9 or 10 failure risk?
What is Detection Level 3
This is the total number of EV's delivered by GM through Q3 (closest without going over)
What is 70,450
The standard GD&T symbol for circular runout is represented by what
What is a diagonal arrow pointing northeast
The "GA NPN" program milestone represents this requirement for all future dates
What is the date all General Assembly part changes that impact fit/form/function or interchangeability require a new part number
This process file goes hand in hand with Mod Level Definitions and is the gold source for what Mod Level is allowed based on the program type (LCI, MCM, Major)
What is a Target Sheet
This is the site where body shop build data is stored
What is GDIS (Global Dimensional Information System)
First introduced in 1964, the Pontiac GTO, which stands for this, ran production for 10 years before being discontinued and brought back in 2004.
What is Gran Turismo Omologato
One of these "control" categories is not a standard group: Form, Profile, Orientation, Translation, Location, Runout
What is Translation
This weekly "integration review" meeting brings together program, performance and plant management to discuss program issues that need awareness or decisions
What is VAPIR (Vehicle and Performance Integration Review)
The total duration, in months, of a GVDP 5.8 LCI program (closest without going over)
What is 37
To ensure repeatability of an assembly line process, you might perform this process
What is a Run@Rate
This catchy nickname referred to the group of 7 women hired by Harley Earl in the 1950s to become some of the first females in studio
Who are the Damsels of Design
This SOR Appendix/GMW states the dimensional requirements that suppliers must adhere to
What is Appendix F6 (GMW15745)
This system is used to compile and release software and calibration files for SW program milestones
What is Soft Part Release
VxPx (Vehicle and Propulsion Integration Content) define the program change content prior to PCS Picking. What is one of the allowable 3 VxPx callouts for an LCI program
What is V1P0, V1P1 or V2P0
Although all parts receive standard care, KCDS designators can specify when additional care is needed. Name one of the 4 categories
What is: KPC (key product chart), PQC (product quality chart), confirmation, traceability
ACDelco, a parts brand owned by GM, was created in 1974 with the marger of two companies, AC and Delco, which are acronyms for this
Albert Champion - Dayton Engineering Laboratories Company