IWS
CIL
Defect Handling
LE
SUC
100

What does AM Stand For?

Autonomous Maintenance

100

CIL stands for 

Clean Inspect and Lubricate

100

Source of _______ is a type of defect that is defined as: the presence of an external agent or material a month the equipment/process area

Contamination
100

What does LE Stand for?

Loss Elimination

100

PDCA stands for

Plan Do Check Act

200

What does IWS stand for

Integrated Work System

200

Which of the following is not apart of a component of a CIL?

Inspection Point, Method, Tool, Frequency, Fixing Defects


Fixing Defects
200

How many types of Defects are there?

7

200

What are the two types of 6W2H

WPI and UPS

200

What does GMP stand for

Good Manufacturing Practices

300

This IWS Pillar enables root cause problems solving to remove chronic operational losses, waste and losses in methods and work processes

Loss Elimination

300

An output measure of a CIL is 

# of Planned stops or

Planned Downtime

300

This defect begins with a "U" and can include keys, ChapStick, loose paper in work area

Unecessary Items


300

What is the purpose of a 6W2H

To get a refocused problem statement

300

Tech states they are drowsy from in OTC medicine they took before work. What are your next steps?

NWR incident report and form

send them to medical provider with EJF

400
Name the 3 Daily Management Systems in AM

CIL

Defect Handling

Centerline

400

When should CILs be completed

During Planned stop
400

Why do we do CILs?

Prevent Forced Deterioration

Expose Hidden Abnormalities

Detect Abnormalities

Identify Problem Areas

400

When would you use a Why-Why

When you have a refocused problem statement

400

What are the 4 strategies of the CBN

50 Years in MoVal

Zero Injuries

50% Less Turnover

50% Reduction in $/PL

500

Who are the LE and AM Pillar Leaders at the WCMC

Ally and Jeff

500

What is the meeting before the planned stop called?

Pre-Huddle Meeting

500

Total Deterioration - Natural + _______

Forced


500

There are __ types of waste

8

500

A cross trained technician out of PEAS is at what T-level

T2.2

M
e
n
u