100

When are respirators needed?

What type of Facial Hair is allowed?

When entering a confined space

Wet Noodle and Dali not acceptable 

100

How should concrete resto be billed?


Concrete resto goes to Q3. 

& T&E resto also goes to Q3. 

100

What information should not be shared with recipients outside of the organization?

Account #'s

Customer's contact information 

Premise #'s

100

When are CT's required?

When a service is over 400amps
100

On unit work, an SP has 13 steps how should the contractor bill?

How do you verify how many steps are in the SP?

Anything before the 10 steps will be billed as units. T&E billed for any steps after the 10th step.

Check the SP

200

When is fire protection needed? How often should the extinguisher be inspected? 

When digging near live utilities

Should be inspected once a month by crews but also require yearly maintenance check completed and documented by qualified personnel. 



200

1750ft of Bore installed, how many potholes are included in the bore unit?

Bore unit includes 1 Pothole per 50ft.

Answer: 35 Potholes.

200

What categorizes a job as Capital VS O&M?

Capital material installed

200ft or point to point on electric WO's

5ft or more on Gas distribution WO's

200

What is the number of times you need to stick a fork in a toaster before learning it is a bad idea?

Once

200

If a trench is 3ft wide by 3ft deep and 100ft long. How should the NC82 (added depth) unit be billed?

1ft of added width= 3 cubic feet= 1.5 NC82 Unit. 


1.5*100= 150

300

Name one of the Safe 8 Principals.

Bonus points: what is one of the safer 8 principals?

Pothole Facilities. 

Watch Bore Head Cross utilities 

3ft clearance when crossing below

2ft clearance when crossing above

3ft separation when paralleling 

Never Stack facilities

300

Bob the lineman removed one OH XFMR and Installed a new OH XFMR on a pole. What unit should be billed to capture the XFMR removal and install?

PR70 x 2.

300
Are energizing and terminating included under the DSEC replacement units?

Yes, should not be billed separately as T&E.

300
If a crew is past their 16 hours and needs to continue working, what type of time can they charge per the union contract?

What about meals?

Per the union contract it would be Double Time until they get 8 hours of rest.


Should an employee be required to work more than 2 hours after any scheduled period of work they shall be entitled to an employee meal and an additional meal every 4 hours thereafter. 

300
How many States does Xcel service?

Texas, Minnesota, Colorado, Wisconsin, Michigan, North Dakota, New Mexico, South Dakota

400

How long does it take for a locate ticket to clear? & how long is the locate ticket valid for?

72 hours. or 3 days

30 days or until paint is no longer visible, whichever comes first.


400

You have a job that is boring for 1200 feet but needs a trench for an additional 300 feet. Which units are applicable? Trench unit for 100-500? Or trench/bore units for 1500 or more?

1500ft or more units should be billed.

400

How should returning of the Service Saver be billed?

Billed as T&E.

Side note:

setting the SS or temp during the OTR or call-out is T&E along with returning the SS

400

What are the minimum depth requirements for primary cable? What about gas main and clearances from electric primary/secondary?

Primary- 30" from top of the cable.

Gas main- 24" 

12" minimum clearance from each other, unless IP or Feeder.

400

How should compaction be billed?

regular 95% compaction included in the units, read the assumptions in the units contract. 

95% Modified only when called out on the design and will require compaction testing. 

500

At what depth is shoring required? & at what depth does it require engineered shoring?

4ft requires means of egress

5ft requires protective system

6ft fall protection required

20ft+ requires engineered shoring

500

When billing NC98: ½” OR LESS SELECT MATERIAL BACKFILL 

200ft x 4ft x 2ft= 1600 Cubic Ft, how many CY of fill should be charged?  (27 cubic feet in one Cubic Yard)

200ft x 2ft wide x 4ft deep= 1,600 Cubic Feet. (27 cubic feet in one Cubic Yard) 1,600/27= Aprox 59 CY

500

What are ways of determining when the fault was resourced by a contractor?

Use the RECON fault team inbox. 


Utilize NMS to determine the time/date the SP steps were performed

Fault Schedule

500

If you will be shallower than 30" to the top of the cable, what do you need to do per any NESC requirements?

You will need to put the cable in conduit and encase it in red concrete, not just cover it in concrete. 

Will need Xcel standards pre-approval. 

500

When a contractor is needing to use the air hammer for a bore in rocky conditions, what steps do they need to take?

Will need to attempt bore with normal bore equipment prior. Will need to provide PM with ample information ( pictures, videos, etc.)

Will also need to identify what equipment set up they will be utilizing. (Air Hammer or AT Drill). Duration needed?

Make sure quote is included in the invoice. Along with time sheets showing daily progress. 