That's Hot!
It's About Time
Who Did That?
That's A Good Book!
Is that Big?
100

Calibration block must be within what temperature of the part to be examined

25°F 

100

Maximum Interval for a visual examiner's eye exam

1 Year

100

Who preforms On-Stream Inspections (2 Answers)

Inspector or Examiner 

100

NDE Procedure Guidelines Code

ASME Sec V

100

Maximum pipe size normally allowed for threaded pipe

2 NPS (That Big)

200

Minimum flash point of hydrocarbons used for leak testing

120°F

200

Minimum time an examiner should be in a darkened area prior to using a black light for  MT & PT exams

5 Minutes

200

Who approves On-stream welding

Owner/User

200

Code to follow when performing an internal inspection on pipe

API 510

200

Minimum upstream limit of intensive examination of injection point circuit

12"

300

Maximum possible temperature for UT readings per API 574

What Is 1100 °F

300

When should temporary welded pipe repairs be replaced

At the next opportunity

300

Who determines whether a pressure test is needed after repairs

Inspector

300

Fitness for  Service (FFS) Code

API 579

300

Pipe size where pipe is almost always made using rolled and welded plate

>16 NPS

400

Graphitization occurs in Carbon Steel and 1/2 Mo materials

800 °F

400

Maximum thickness inspection interval for an Injection Point

3 years or half life whichever is less

400

Who ensures individuals taking thickness measurements are trained and qualified

Owner/User

400

Code for Cathodic Protection

API 651

400

Maximum length of  Crack, or Incomplete Fusion allowed on a new weld

0"

500

Minimum pre-heat temperature, when pre-heat is substituted for PWHT

300°F

500

Suggested interval for Above-grade Visual Surveillance of  buried pipe

6 Months

500

Assess crack-like flaws and environmental cracking (2 Answers)

Engineer And/or Corrosion Specialist

500

Code to follow when welding on In-Service Equipment containing Flammables

API 2201

500

 Mill tolerance for rolled and welded pipe

-0.010"

M