A/R & Cash Flow
Documentation
Water Mitigation
Mold Remediation
Reconstruction
100

The position ultimately responsible for collections.

What is the Project Manager?

100

Photos should be taken at this point in the job.

What is every phase?

100

This piece of equipment helps move air across wet surfaces.

What is an air mover?

100

This PPE item protects you from breathing in mold spores.

What is a respirator?

100

This is the first step of Reconstruction.

What is a Pre-Construction Meeting?

200

The most common reason invoices sit unpaid past 120 days.

What is missing or incomplete documentation?

200

This is when a job should be Docusketched.

What is every job Pre-Mitigation and Post-Demo?

200

This happens if wet materials are not dried quickly.

What is mold growth or secondary damage?

200

This prevents mold spores from spreading to unaffected areas.

What is containment?

200

This form is required before starting any additional work outside the scope of work.

What is a written change-order?

300

This should be confirmed before work starts to avoid billing disputes later.

What is scope approval and payment expectations?

300

This missing item causes the most supplement pushback.

What are moisture readings and drying logs?

300

This document guides proper water mitigation procedures.

What is the IICRC S500?

300

This airflow setup keeps contaminated air from escaping the work area.

What is negative air pressure?

300

This documentation proves reconstruction was completed correctly.

What are progress and completion photos and written updates?

400

This action prevents “You never said that” conversations.

What is written communication?

400

This method of photo taking gets the entirety of the room in 4 photos.

What is the 4-Corners Method?

400

This drying principle explains how temperature, airflow, and humidity work together.

What is psychrometrics?

400

This PPE level is commonly required for moderate mold remediation.

 What is a half-face respirator with P100 filters?

400

This mistake creates the most customer complaints during reconstruction.

What is poor communication or unmet expectations?

500

This mistake delays payment even when the work was done correctly.

What is not talking about the billing process upfront?

500

This documentation is most often missed during storm response.

What are initial site conditions/extraction photos?

500

This decision must be made early to prevent secondary damage.

What is removing unsalvageable wet materials?

500

This mistake creates the highest liability during mold remediation.

What is failing to use proper containment and PPE?

500

This mindset keeps reconstruction profitable and customers happy.

What is ownership from start to finish?