Quote Version Management
Multiyear Quote Process
Proration Rules
Service Plan Discounts & Approvals
100

When must a new quote version be created?

Every time any change is made to a quote.

100

Which SAP transaction is used to update an existing quote?

VA22

100

When should proration normally be calculated?

At the start of the service period.

100

What is the maximum Territory/Account Manager discount for 1–5 instruments?

3%.

200

Is a new version required when reverting to a previous configuration?

Yes, a new version is still required.

200

How many additional material lines are needed for a 3-year quote?

Two additional lines.

200

Who can authorize changes to the standard proration approach?

Sales.

200

How many instruments qualify for an 8% Territory/Account Manager discount?

More than 10 instruments or products.

300

What is the correct naming format when saving a quote file?

CompanyName_QuoteNumber-VersionNumber

300

What is the default annual price increase if Sales does not specify otherwise?

3%.

300

How should prorated periods be listed for monthly or quarterly billing?

As separate lines.

300

What is the maximum discretionary discount a Director can approve?

17%.

400

What must be done if a quote version number was added incorrectly?

Add a note clarifying and confirming the correct version number.

400

What period of coverage does each material line represent in a multiyear quote?

One year.

400

How should proration be listed when billing is annual and less than one year?
 

Combined with the base year into one line.

400

When is Service Sales Manager approval always required before offering a discount?

When coverage exceeds one year and the annual increase is less than 3%.

M
e
n
u