Variable bore rams shall be tested with the smallest and largest drill pipe to be used per _______ regulations.
What is AOGCC
WCBD
What is "Well Control Bridging Document"
Number of Re-Entry Sidetrack Wells
What is 28
Consists of 21 land rigs and 1 barge rig
What is Parker's International Fleet
D1
What is kick while tripping
A common phenomenon when drilling on the north slope of Alaska, and can complicate recognition and response in well control operations.
What is well bore breathing
MASP
What is "Maximum Anticipated Surface Pressure"
Number of new wells
What is 21
Consists of 13 barge rigs in GOM and 2 land rigs in Alaska
What is Parker's US fleet
D2
What is kick while drilling
A minimum of one ____ , held in the open position with appropriate crossovers and operating handle shall be available on the rig floor at all times
What is Full Open Safety Valve
SICP
What is "Shut in Casing Pressure"
Number of Work Over Wells
What is 4
Year that Parker Drilling was founded in Oklahoma by G.C. parker.
What is 1934
D3
What is a diverter drill
Posted at BOP panels, and gives directions on shutting in the well.
What are standing orders
MAWHP
What is "Maximum Anticipated Wellhead Pressure"
Kicked off new develop in this reservoir on the east side of the slope.
What is Lisburne Reservoir
The year the company begins Alaska operations with contract from the U.S. Atomic Energy Commission to drill large diameter holes for nuclear testing.
What is 1968
D4
What is a accumulator drill
Has the overall responsibility for the well
Who is the BP WSL
OEM
What is "Original Equipment Manufacturer"
Rated for ____MPH winds with 20,000 pipe set back on floor
What is 100
In 1981, Parker Drilling builds the world’s largest drilling rig, Parker 201, capable of drilling to _____ feet.
What is 50,000
D5
What is a well kill drill