Rigging Part A
Rigging Part B
Rig Move Awareness
Drilling Fluids
Storage & Inventory
100
A common material used for sling contruction is BLANK.
What is WIRE ROPE.
100
The type of chain hoist most suitable for a horizontal pull is the BLANK.
What is COME-ALONG.
100
The main reason to winterize a rig is to gaurd against BLANK.
What is FREEZING.
100
Polymers make mud more BLANK.
What is VISCOUS.
100
The BLANK is responsible for keeping the drilling fluid system and equipment parts in stock.
What is a DERRICKMAN.
200
Two types of shackles often used in rigging are the BLANK and the BLANK.
What is BOW & D-TYPE.
200
To prevent overloading slings, sling angle must never be BLANK.
What is LESS THAN 60 DEGREES.
200
List (6) areas in which a motor hand is involved with during rig out are?
What is NIPPLE OUT, RIG FLOOR, DERRICK, BUILDING, SUITCASE & BOILER.
200
When mud is considered to have a high viscosity, it is BLANK.
What is THICK.
200
The BLANK is usually respsible for keeping all the other rig component parts ordered as well as all lubricants the rig requires.
What is MOTOR HAND.
300
The BLANK on a bight can be used ti tie a bowline in the center of a line and make up a set double sling legs.
What is BOWLINE.
300
The hoisting hook must always be above the BLANK.
What is LOADS CENTER OF GRAVITY.
300
Prefabs can be made out of what (3) materials?
What is CANVAS, PLYWOOD & METAL SHEETING.
300
What are (3) types of water based mud?
What is GEL, POLYMER & FLOC.
300
WHIMIS requirements apply to all BLANK products.
What is HAZARDOUS.
400
Sharp wire ends sticking out of the rope or sling can cause BLANK and BLANK.
What is PERSONAL INJURIES & DAMAGED LOADS.
400
The preferred type of hitch to hoist a bundle of drill pipe while using two slings is a BLANK.
What is a DOUBLE WRAPPED BASKET HITCH.
400
The motor hand has BLANK with the rig up and rig out.
What is RESPONSIBILITIES.
400
What are (3) main categories of drilling mud?
What is WATER BASED, OIL BASE & UNDER BALANCED.
400
Oils should be stored so no BLANK can contaminate the clean oil.
What is DIRT.
500
All chains used for hoisting should be examined BLANK for defects and wear before being used.
What is LINK BY LINK.
500
List (3) procedures for maintaining wire rope are?
What is CLEANING, INSPECT & LUBRICATE.
500
Do not fix electricalequipment unless you are BLANK.
What is A CERTIFIED ELECTRICTIAN.
500
Oil based muds can make it difficult to BLANK well kicks and have gas BLANK in the oil.
What is DETECT & DISSOLVE.
500
Motor hands are responsible for BLANK and BLANK the engines that power the drilling equipment.
What is OPERATING & MAINTAINING.
Continue
ESC
Reveal Correct Response
Spacebar
M
e
n
u
Team 1
0
+
-
Rig Tech Motorhand Level 1 (5)
No teams
1 team
2 teams
3 teams
4 teams
5 teams
6 teams
7 teams
8 teams
9 teams
10 teams
Custom
Press
F11
Select menu option
View > Enter Fullscreen
for full-screen mode
Edit
•
Print
•
Download
•
Embed
•
Share
JeopardyLabs