What approval is needed for Flowfill acceptance?
Project Engineer Approval
Steel and Iron Products require you to verify what in the documentation?
What is Chain of Custody?
What colors represent the conditions of a QPM?
What is Green, Yellow, and Red
What activity requires you to take a Sand Equivalency Test to be taken Daily?
What is Concrete Paving
What acronym/s is used to locate Pre-Approved items?
What is APL/QML
Where do you find the monthly requirements that the contractor must follow for Buy America?
What is FMM Special Notice to Contractors
What 2 CDOT Processes are Price Reductions already included in the Report
What is PCCP & HMA
Who needs to be notified when a sample is dropped off in a Lab office?
What is Lab Manager
What document do you find the SiteManager Material Code on for entering a COC?
What is Certification Checklist
Construction Materials and Manufactured Products are used on your project. What CDOT form should be used?
What is a Form 1600
What needs to be created in the field to test shotcrete?
What is a Test Panel
What is the first thing you do when you bring a sample back to a Rocksol Office Lab?
What is Login sample
What was Saeids reason for starting rocksol consulting group?
What is required for final Paving documentation acceptance?
Email from CDOT pavement acnologing final QPM Report
What does the acronym BABA stand for?
What is Buy America for America
How many total OA cores are taken during a Compaction Test Section
what is 7 cores
What is labled with the following... Contract ID, Field Sheet Number, Break Date, Maturity (7, 28, 56 day, etc.)
What is a concrete specimen
How often do you need to send out a QPM report?
What is Daily during paving
What items should NOT be reported on a CDOT Form 1600
Ferrous Metals/ Steel & Iron products
What is the required passing score for a CTS?
What is 75
How long can a Draft 43 take for CP-52 mix design?
What is 4 to 6 weeks