What does the O (circle) Symbol mean in an EWI?
Find Number
What is the Torque SMP?
SMPTQ002
Explain Run On Torque
Force it takes to overcome the friction of the threads
What do you do with a bad part?
Segregate it in a bag, write a QN, and place into PRB cage
What is the code for "Assembly Procedures" and "How to Process Specific Processes"?
E02-02 - Assembly Procedures
E02-04 - How to...Processes
What does the Hexagon symbol mean?
Torque value
What is the Lockwire SMP?
SMPTQ002
How many twists in a lockwire pigtail?
4-5
How do you know if a part has had an MRB action taken?
Tagged or stamped
What should you do if a tool is past it's calibration date?
Bring it to the tooling cart and go through the process of submitting the tool for calibration
What is the Square Symbol mean?
Reference Number(s)
What is the SMP for BCP?
SMPMILB5087
Convert a compound ratio of 18:3 to weight
18 units to 3 units (18 lbs to 3 lbs)
What are the 2 job instructions that you need to know for PRB?
J01-08 and J01-09
Where do you dispose of expired compounds?
Tool Crib
What does the Triangle mean in an EWI?
Engineering note
What is the Workmanship manual code?
41-10748
Per SMPMILB5087, what lube do you use on a screw?
NONE.
There are 5 letters you need to know for MRB stamps. What are they and what do they stand for?
Presuffix, R (Supplier) and N (Internal)
and
Suffixes, C (Commercial), M (Military), and A (Both Commercial and Military)
How do ensure you are not missing parts for the operational sequence being worked?
Lay out all your parts prior
How do you know if you are working on the most current EWI?
What is the O-Ring SMP?
SMP6054-1
How do you transfer an LN2 tank in an elevator?
2 person job - 1 person goes ALONE in the elevator to the desired floor and waits for the tank; 2nd person places LN2 tank into the elevator ALONE and sends it to the desired floor. LN2 Tank travels in the Elevator ALONE.
What is the difference between Rework and Repair? Which one does cell 1/4/9 work on?
Rework: rework cannot violate engineering drawing specs; all rework must be inspected
Repair: Post MRB processing of parts; reestablishing a component's original functionality
Cell 1/4/9 works on Reworks ONLY, Repair is done by R&O
What do you do if the Rev letters and/or dates do not match the EWI and/or Blueprint?
Go to Craig