Random EMS
Fire
Building Construction
Incident Command
EMS Protocols
100

What is Cerebral thrombosis 

 a blood clot obstructing the artery

100

What is the Fire Tetrahedron? 

Heat, Fuel, 02, Chemical Chain Reaction

100

Type of Building Construction

Type 3

100

3 strategic goals

Life Safety Incident stabilization, property / environmental preservation 

100

EMR care for patient with smoke inhalation

02 15LPM NRB

200

Cerebral hemorrhage

ruptured artery / ruptured aneurysm

200

What are 4 examples of sectors we divide our incidents into

Divisions/Groups/Strike teams/ Task Force

200
  • Materials: The walls are made from non-combustible tilt-slab or reinforced masonry, while their wooden roofs are flammable.
  • Strengths: With a combination of non-combustible masonry and fire-cut joists, exterior walls can stand even if the floors collapse.
  • Weaknesses: Many buildings of this type have connected attics or horizontal void spaces, enabling flames to spread unless fire stops are installed.

Type III

200

RECEO VS

Rescue/Exposure/Confinement/Extinguishment/  Overhaul, Ventilation, Salvage

200

BLS Care for Smoke Inhalation

02 15lpm/ Albuterol 2.5mg in 3ML of normal saline via nebulizer over 15 minutes and apply waveform capnography. 

300

In suspected stroke if BS is less than ___ D10W should be administered 

60

300

Hemoglobin likes CO ____ times more than oxygen

250

300
  • Unprotected metal components make this construction type prone to early collapse.
  • Combustible products used for built-up roof materials (insulation foam, asphalt water proofing, felt paper, rubber) may be highly flammable and can lead to a separate fire above and below the roof (metal roof deck fire), which can self-sustain and spread due to generated heat and flammable vapors from these highly combustible materials.
  • Ceiling void can allow a significant volume of heated gases to collect in the overhead, which can drop down rapidly, leading to a trigger event (flashover, backdraft) on the introduction of sufficient air.
  • Failure to cool the ceiling area early will allow heat to weaken unprotected steel, prompting potential failure and collapse, as well as contribute to a metal roof deck fire and trigger events.

Type II

300

Our 3 Benchmarks and what they mean

ALL CLEAR:

The Primary Search is Complete

UNDER CONTROL:

The Fire is under control Not Extinguished

LOSS STOPPED:

Environmental / Property conservation is complete

300

is used to deliver an electrical stimulus to the heart that acts as a substitute for the heart’s conduction system and is intended to result in cardiac depolarization and myocardial contraction.

Transcutaneous pacing (TCP)

400

Scene Time with suspected stroke should be no longer than

10 minutes

400

Carbon Monoxide Poisoning occurs at __ % reading on our RAD57

10%

400

Modern _____(Type __) structural members are often engineered by using laminated lumber. These members can fail much faster as the laminate glues that hold them together can degrade and vaporize under heat conditions.

V

400

Command Modes and meaning

Nothing Showing: Nothing showing
Fast Attack: Command going interior
Command Mode: Command is outside

400

ILS care adds what to smoke inhalation protocol? What is the dose?

Atrovent .5mg via neb
Daily Double if you get In-Line nebulizer for unresponsive/in respiratory arrest.

500

Name 5 risk factors for stroke

 Hypertension  Atherosclerosis / coronary artery disease  Atrial fibrillation  Hyperlipidemia(high cholesterol)   Diabetes  Vasculitis (inflammation of the blood vessels)  Lupus (autoimmune disease) 

500

If someone has a low RAD reading but is experiencing similar symptoms to CO poisoning what is likely the problem 

HCN poisoning

500
  • Wood will burn.
  • Older buildings may have dry rot, water damage, or damage from wood-boring insects.
  • Void spaces are common, and in balloon-frame can be extensive.
  • Renovations are commonplace in older structures.
  • Vertical voids begin in basements and can lead to significant vertical fire spread to the attic.

Type V

500

3 General types of radio reports

Initial On Scene Report
Status Report
Transfer of Command

500

Cyno-kits dosage

5g in 200ML  

M
e
n
u