Electric Terminal Tractor
Guideline for EV Charging Infrastructure, Planning, Installation & Operation
Charge Cycle Optimization & Energy Management Guidelines for BEV's
About TMC
100

In diesel applications, it's measured in gallons of fuel, in BEV, it’s measured in kWh

How is energy measured in a BEV / Electric Vehicle?

100

Fleets should begin the stage of fleet electrification before ordering EVs

What is infrastructure planning?

100

This is the term for how a vehicle is used throughout the day, including work and rest periods

What is a duty cycle?

100

A larger assembly of people dedicated to the improvement of equipment, maintenance, and maintenance management

What are Study Groups?

200

This activity could take up to two years and sometimes longer

What is the infrastructure planning and permitting process?

200

Its job is to support the Fleets needs for available power to Electric vehicles

What is a charging infrastructure?

200

This fee from your utility is based on the highest power draw in a short time period, and you want to deploy chargers smartly to avoid them.

What is a demand charge?

200

This group of people are focused on a specific area to improve the equipment, maintenance, and/or maintenance management

What are Taskforces?

300

This analysis will help you in spec’ing the proper size battery pack and e-Propulsion system

What is a duty cycle or application analysis?

300

The spot provided for Electric vehicle parking and charging

What is a charger location or stall?

300

This is the term for charging that happens at the fleet’s own facility, not out on the road.

What is depot charging?

300

This document is circulated during a meeting in search of contributors

What is a Greensheet?

400

These may be used to offset the cost of an Electric Vehicles

What are grants and incentives?

400

The process to energize a site prior to utility interconnection to be used to support initial vehicles

What is temporary charging solutions?

400

This is the percentage range where a battery should ideally stay to preserve its health.

What is the state of charge (SOC) window?

400

In its 20-year, this event tests skill and knowledge for supporting vehicles in a fleet

What is the SuperTech competition?

500

The amount of effort, time and investment required to prepare this element in support of an Electric Vehicles is directly tied to size of fleet, location and safety regulations

What is development of charging infrastructure?

500

This person is key to aligning stakeholders and driving the planning process for your EV infrastructure

What is an internal champion?

500

This is the total amount of energy a battery can store and deliver before needing to be recharged

What is battery pack size?

500

Bob the minion

Who is the technical contributor to ATA?

M