PPE
Cranes
100

The ____________ must use PPE.

What is the Employee?

100

There are document that must be in place prior to a crane mobilizing are _________, ____________, and _____?

What is the Certificate of Approval, Certificate of Inspection, and Certificate of Operation?

200

The first method on the hierarchy of controls is ___________.

What is Elimination?

200

When Assembling and disassembling a crane an _____________ director must supervise the operation. 

What is a A/D director?

300

__________ is the last resort when trying to control a hazard.

What is Personal Protective Equipment?

300

A Licensed Rigger or Registered Design Professional is Required always is required for __________ operations. 

What is Critical Lift?

400

Fall protection must be used any time a worker is with in ______ feet from an elevated surface.

What is 6 feet?

400

____________ must be used to guide the load. 

What are taglines?

500

A ___________ must be in place prior to removing protection. 

What is a Controlled Access Zone?

500

Crane operations must stop when wind speed reaches 

What is 30 miles per hour?

600

A body belt is a form of fall protection.


True or False 

False.

A body belt is a positioning device and must be use with PFAS. 

600

An assist crane.

What is a Derrick?

700

Class G hardhats can resist 2,200 volts of electricity.

True or False

True

700

Safety coordination meeting is used for __________  crane. 

What is a tower or crawler crane?

800

Prior to wearing a respirator a worker must have __________.

What is a FIT test?

800

All cranes and derricks must be equipped with an __________. 

What is an Anemometer?